My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:43:43 AM
Creation date
1/6/2022 8:40:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAP# 2 ANNOTATED SITE MAP <br />BUSINESS NAME SAFEWAY FUEL CENTER #2707 <br />B[SINESS ADDRESS 6425 N. PACIFIC AVENUE STnCKTON <br />Slantec Ic,:.!,,re Inc. <br />A A 949,54 <br />ok a* stortec corn <br />ZIP CODE 95207 DRAWING SCALE <br />NOF TO SCAL E <br />NOTES/RECORD OF WORK EXECUTION <br />9/21/22: EXECUTED SCOPE ,TEMS 1, 2. 3 FOR UDC 13-11. & UDC 15-16. HYDRO TESTING N BOTH UDC PASSED. SEC. PPNG ,NTEGR;TY PASSED FOR SEGMENTS 81 & 82 (ALL GRADES) <br />9/22/22: EXECUTED SCOPE ITEMS 1.2.3 FOR UDC 9-10 & UDC 5-6. HYDRO TESTING IN BCTH LDC PASSED. SEC. PPNG •NTEGRITY PASSED FOR FULL RUN-8 (D 591 ONLY) <br />9/23/22: RESOLVED RUN-8 87 FAILURE (LEAK N CROSSOVER ASSEMBLY AT 15-16). ALL GRADES ON RUN-8 PASS INTEGRITY AND COMMLN CATION TESTING <br />9/26/22: EXECUTED SCOPE ,TEMS 1, 2. 3 FOR L DC 11-12. & 7-8 HYDRC TEST NG BOTH UDC PASSED. SEC. PIPNG INTEGR TY PASSED FOR SEGMENT A1 & A2 (ALL GRADES) <br />9/27/22: EXECUTED SCOPE ,TEMS 1,2. 3 FOR UDC 3-6S UDC 1-2, HYDRO TESTING BOTH UDC PASSED, SEC. PIPING INTEGRITY PASSED FCR SEGMENT A1-AL (FULL RUN-A. ALL GRADES) <br />10/11/2022: FINAL INSPECTION TESTING WITH CUPA, ALL UDC PASS PER STS HYDRO AND ALL LINES PASS INTEGRITY/COMMUNICATION PER PEI RP 1200 <br />PIPING RUN <br />DESIGNATIONS <br />RUN A: UDC 11-12 TO UDC 1-2 <br />SEGMENTS <br />Al: STP TO UDC 11-12 <br />UDC 11-12 TO UDC 7-8 <br />UDC 7-8 TO UDC 3-4 <br />UDC 3-4 TO UDC 1-2 <br />A <br />1 <br />2 <br />RUN B: UDC 13-14 TO UDC 5-6 <br />Bl: STP TO UDC 13-14 <br />UDC 13-14 TO UDC 15-16 <br />UDC 15-16 TO UDC 9-10 <br />UDC 9-1010 UDC 5-6 <br />SCOPE FOR <br />2022 SECONDARY <br />TESTING (TO MAKE <br />SITE TESTABLE) <br />R&R DISPENSERS IN PAIRS <br />ALONG RUNS: TIGHTEN ALL 2X2 <br />BOOTS; INSTALL <br />TESTABLE CROSSOVER <br />JUMPERS TO ALL 2X2 BOOTS <br />WITH DISPENSER PAIRS OFF, <br />CONDUCT UDC HYDROSTATIC <br />PRETESTING <br />WITH DISPENSER PAIRS OFF, <br />CONDUCT SECONDARY TESTING <br />OF PIPING SEGMENTS <br />ONCE ALL TESTABLE CROSS- <br />OVERS ARE INSTALLED, CON- <br />DUCT SECONDARY TESTING OF <br />COMPLETE PIPING RUNS AND <br />HYDROSTATIC TESTING OF ALE <br />UDCS <br />CONTRACTOR <br />ARMER/NORMAN & ASSOC. INC <br />2600 WILLIAMS ST <br />SAN LEANDRO CA 94577 <br />CA LIC 256896 <br />925/671-9200 <br />3 <br />4 <br />5 <br />6 <br />'505 kat C.ItaWe Nal , <br />*Stan <br />DATE 2022-SEPTEMBER <br />A4 <br />Rai M D3I0P 2oK loK <br />PACIFIC AVENUE AVENUE
The URL can be used to link to this page
Your browser does not support the video tag.