My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:43:43 AM
Creation date
1/6/2022 8:40:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TS-STS Sump Test System <br />Quick Start Guide <br />TS-STS Installation <br />Franklin Fueling Systems <br />TS-STS Overview <br />The TS-STS system Includes a TS-STS console within a convenient <br />portable case, leak testing probes with 50 feet of cable, and probe <br />hanging hardware (slip rings and chain). <br />After all fittings within the serrip are sealed, the sump Is filled with a <br />water-based test solution that covers all sump peeetration holes. The <br />probe Is installed so the float is floating on the surface of the test solution. <br />The TS-STS console is quickly programmed with the site name and <br />address, number of sumps, the 7-digit code-names for each sump, and <br />the correct Time/Day/Date before leak testing. <br />Pressing the Test key at the console keypad starts sump leak tests for <br />all sumps. The test time is 15 minutes and tests for a level change <br />greater than 0.002 inches. If the level of a sump drops more than the <br />leak limit during the test, the Sump Leak Test Report will show a fail <br />result when the test is finished. Leak tests can also be programmed <br />(scheduled) to start at desired times. <br />When finished, leak test reports will automatically print out at the console <br />printer. Extra copies of this report can be printed using the report key. A <br />newly completed Sump Leak Test will overwrite the previous results <br />stored in memory. Save sump leak test reports and provide copies as <br />evidence of compliance with regulations. <br />Recommendation: Use a computer and the Tcch vers?on of <br />System Sentinel 4" to record site data, sump code-names, and test <br />results. Test results can also be extracted from Comm Part 1st <br />Clue bottom of the TS-STS console (afse see Seclion <br />Reference Federal and State regulations for leak limit and test <br />time requirements. Recommendations for locating the rS•STS <br />console outside of the (Class I. Division 1, Group D) Hazardous Areas <br />during tesdng. are based an PIFPA 30, P1FPA 30.4 and AfFPA 70 (NEC). <br />IWO. FP. 000-300C Revt:1 2V° YOZNititaklilltedle COM Thls onefl may change wi glow prior riot., 14 COW Is Reg... Tidemark of Fseeklin Fudlrr Spa.. <br />eg 1 <br />1.) Required Materials: <br />a.) Tape to secure the probe cable b.) Safety cones & signs <br />Grounded, 2-pronged extension cord <br />Flat pieces of metal to suspend leak testing probe over sumps <br />2.) Work safely —install Safety Cones and Signs at the site <br />3.1 The probes are precision instruments — handle with care! <br />The STS probes are shipped w th cables attached. do not remove <br />the cable from the probe end.., remove at the console case only. <br />Inspect probes for proper float movement before use, then install <br />probes as shown in Section 1 <br />Connect the yellow probe cables to the receptacles at the TS-STS <br />case. Make sure to line up keyways befcre inserting cable end <br />tightening the screw-on connector. <br />Locate the TS-STS case outside of the Hazardous Area and tape <br />the cable down to prevent probe movement during the test and to <br />reduce tripping hazards <br />8,) Setup I Program the TS-STS ccnsole per Section 2 <br />Start sump leak test(s) on sJrrips that are ready <br />Always clean, dry, and store probes in the probe carrying case after <br />each use <br />Test each of the probes on a monthly basis to ensure Its ability to <br />detect leaks. Install the probe in a test conta ner and initiate a :est. <br />After 5 minutes, remove about 0.12 inches cf wets'. When the test <br />completes, the test report should show a Failed result if the probe <br />is working properly.
The URL can be used to link to this page
Your browser does not support the video tag.