My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:43:43 AM
Creation date
1/6/2022 8:40:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Case Gilson <case@armer-norman.com> <br />Sent: Tuesday, September 13, 2022 7:28 AM <br />To: EH-UST <ust@sjgov.org> <br />Cc: Keith Powers <Keith.Powers@albertsons.com>; Tyler Olea <Tyler.Olea@albertsons.com>; Aldo Basurto <br /><aldo.basurto@safeway.com> <br />Subject: Safeway 2707, 6425 Pacific Ave, Stockton - Secondary Containment 2022 <br />Good day SJCEHD HazMat/UST <br />I am writing to align on secondary containment status at the subject facility. Recent 36-mo periodic testing documented <br />"fail" for all secondary piping pressure integrity and UDC hydrostatic integrity but the testing was attempted with all <br />secondary piping termination boots removed. With the new drip-floor UDC adapter frames at the site, the UDC necks <br />are now significantly closed and thus the piping termination boots are not accessible from grade for secondary testing. <br />To make the UDCs and the secondary piping testable, valved secondary jumpers will be installed for all termination <br />boots. This configuration allows each UDC to act as "point of earliest detection" containment structure for the <br />secondary piping and to be "closable" from grade for periodic secondary testing. Test jumper valve remains open to <br />UDC floor for site operation and is closed only for testing (jumper lead/valve pulled up to grade via pull cord/leash). <br />Secondary communication will remain testable/provable (from end of piping run to STP). <br />I will transmit 48-hour notice of secondary testing as soon as we configure the site (jumper installation) and are ready to <br />test the site. This will be to satisfy the current 36-mo periodic. <br />Regards <br />Case Gilson <br />Armer/Norman & Associates, Inc. <br />CA License 256896 <br />925/671-9200 - Armer/Norman office <br />925/499-1032 - mobile (text is best) <br />case@armer-norman.com
The URL can be used to link to this page
Your browser does not support the video tag.