My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:01:45 AM
Creation date
1/6/2022 8:40:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address: ESTES EXPRESS 7611 S.AIRPORT WAY MCKrnN ra 95206 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . DIF SFI <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> . . . . . . IL <br /> . . . . . . T L <br /> X <br /> TLS <br /> . . . . . . OFFICE <br /> . . . . . . . . . . . . . . . . . O . . . . . . <br /> O <br /> � KEF <br /> A=Amn'ux Sensor <br /> F=FILLS . . . . . . . . - Dnaing of piping <br /> V=VAPOR d>it•item undo groretd thcr are nor risible to dw cettj,(ting tadvicfan area . • . . exit of sump and <br /> P=PROBE pQfessioral opdonon�t areiars sds;i fw irfor»ntwrttrlprtpac. Draring . . . . . UDC's.No <br /> L=Turbine 1 Leak Detector rotto scde . . . . rewound <br /> X=SLr%EP SENSOR . . . . . . draimmigis <br /> B=Brine Sensor accurate,we <br /> S=Smart Sensor cannot s> e <br /> c=Floats&Chains SOUTH AIRPORT R`AY blue tis.. <br /> E=E Stop <br /> �w <br /> Date map was drawn: 5121121 <br /> Instructions <br /> If you already have a diagram that shows all required information.you may include it rather than this page,with your Monitoring System Certification. On your site plan. <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,d installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces.sumps.dispenser pans.spill containers.or other secondary containment areas:mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided.note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.