My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:34 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINISH <br />REFUSE^ <br />-^ REFUSES <br />r� <br />H 40 PVC SLIP GAP <br />SEE <br />oETNI C3 <br />AOUR <br />.TED SOIL BACKFILL <br />�USE� <br />00 WELL SKIRT 8'X6' <br />A,nA I I—REFUS& <br />W DA HDPE SDR -11 <br />SOLID WELL CASING <br />SOIL BACKFILL <br />SKAPS TRANSNET(TN) <br />HDPE GEOCOMPOSRE <br />WITH 6. FTBRD <br />BUTT FUSION <br />WELD (TYP) <br />S' DA HDPE SDR -11 <br />PERFORATED <br />COURSEAGGREGATEROUNDED <br />PARTICLES 1' TO 3' DA <br />NON -CALCEROUS MINNAL PINES <br />WELL CASING SEE <br />PERFORATIONS DET Gt <br />W HDPE SDR -11 FUSED END CAP <br />BORE DEPTH (SEE WELL SCHEDULE) <br />// <br />/ � <br />�� SCHEDULE) <br />1 \TYPICAL LFG EXTRACTION WELL <br />C3 NOT TO SCALE <br />2'KANAFLEX <br />CONNECT <br />KANAFLEX HOSE <br />COORDINATES <br />SUPPORT <br />WITH <br />(FT MSL) <br />SS BAND CLAMP <br />DEPTHS (F) (SEE NOTE 1) <br />BANDING <br />2'DIAWELLHEADSEEy�- <br />NORTH <br />4%2 <br />BOTTOM OF <br />WASTE <br />SPECS <br />WASTE <br />REDUCER <br />GX-14 <br />2188281.0 <br />813TLR5.14 <br />BO° ELBOW <br />418 <br />WELLHEAD <br />FERNCO <br />150 128 <br />4- HDPE LATERAL <br />COUPUNG <br />WS <br />428 <br />65 CLAMP <br />97 ]5 <br />3% MIN <br />2199853.548138]]&66 <br />BACKFILL <br />300 <br />417 <br />SLOPE TO B' <br />e] ]5 <br />ff <br />SOIL <br />2195305.6881388]8.50251 <br />�y <br />' EXISTINGG <br />416 <br />' <br />O <br />8' HDPE SOLD WELLCASING <br />'IPE ANCHOR SEE <br />DETAIL( <br />E) N <br />WELL <br />SURFACE COMPLETION <br />1 <br />n / NOT TO SCALE <br />NOTES: <br />I . LATERAL FIRING MUST DRAIN TO THE <br />IAN HEADER AT A MINNUM SLOPE <br />OF 3% UNLESS OTHERWISE <br />APPROVED. <br />NOTE <br />gyp) <br />(TYPO <br />WDA <br />PIPE <br />a� <br />O <br />uL <br />�� <br />/ \ <br />WELL CASING PERFORATIONS <br />J <br />f C3 <br />NOT TO SCALE <br />LFG EXTRACTION WELL SCHEDULE <br />NOTE <br />1. DEPTHS ARE APPROXIMATE. ALL SURFACE DEPTHS ARE NOTED FROM GROUND ELEVATDN AS SURVEYED ON 5315 BY F3 <br />AND ASSOCIATES. <br />2. WELL LOCATIONS MAY BE ADJUSTED IN FIELD BY ENGINEER. <br />3. CONTRACTOR SHALL STAKE WELL LOCATIONS AND VERIFY LOCATIONS AND ELEVATIONSARE CONSISTENT WITH THE ABOVE <br />APPROVED WELL SCHEDULE PRIOR TO DRILLING. <br />THE UNDERSIGNED HEREBY HAVE THOROUGHLY REVIEWED AND ACCEPT THE PROPOSED <br />DRY. UNG LOCATIONS AND DEPTHS. WELL INSTALLATION SHALL NOT BEGIN UNTILALL THREE <br />SIGNATURES ARE OBTAINED BELOW. <br />PROJECT ENGWEER(CBM) CHECK DATE: <br />CONTRACTOR DRILLER CHECK: DATE <br />CONTRACTOR SURVEYORS CHECK DATE- <br />* <br />ATE <br />BUTTERFLY VALVE. SEE <br />SPECS <br />HOPE FLANGE ADAPTER WITH <br />DUCTLE IRON BACKUP RING. <br />MIO GALVANIiEp PLATED <br />BOLTS, NUTS, AND WASHERS <br />HDPE HEADER (SIZE <br />IE <br />S <br />) <br />HDPE VALVE <br />SPACERS AS <br />NECESSARY <br />NOTES: <br />1. LOCATE VALVE BETWEEN FLANGES WITH APPROPRIATE <br />SPACERS AS REQUIRED. <br />2. USE HDPE VALVE SPACER OR ROUTER FLANGE ADAPTER TO <br />ALLOW VALVE TO FULLY OPEN. <br />3. INSTALL COCK VALVE WITH? GALVANIZED STREET ELBOW ON <br />BOTH SIDE OF VALVE ON HDPE HEADER <br />4 EiIXATY3NVALVE <br />W NOT TO SCALE <br />- GENERAL NOTES: <br />1. DETAILS OBTAINED FROM SAN JOAQUIN COUNTY FOR CONSISTENCY WITH ADJACENT PROJECT. <br />2. CONSTRUCTION TO BE IN ACCORDANCE WITH FOOTHILL SANITARY LANDFILL GAS SYSTEM UPGRADE PHASE 1 SPECIFICATIONS. <br />COORDINATES <br />ELEVATION <br />(FT MSL) <br />, CB&I Environmental & <br />® Infrastructure, Inc. <br />..e»wn�>n+°arrw.a..Aaww..rm,..AwaurrManm,a4An.a�.� <br />DEPTHS (F) (SEE NOTE 1) <br />WELL ID <br />NORTH <br />EAST <br />BOTTOM OF <br />WASTE <br />SURFACE <br />WASTE <br />BORE SOLID PERF. ROCK <br />CARING CASING ECTIO <br />GX-14 <br />2188281.0 <br />813TLR5.14 <br />247 <br />418 <br />171 <br />150 128 <br />REV. N0. DATE DESCRIPTION <br />2188598.8813]005.5] <br />WS <br />428 <br />11] <br />97 ]5 <br />GX-18 <br />2199853.548138]]&66 <br />300 <br />417 <br />117 <br />e] ]5 <br />ff <br />GX-17 <br />2195305.6881388]8.50251 <br />416 <br />166 <br />145 123 <br />NOTE <br />1. DEPTHS ARE APPROXIMATE. ALL SURFACE DEPTHS ARE NOTED FROM GROUND ELEVATDN AS SURVEYED ON 5315 BY F3 <br />AND ASSOCIATES. <br />2. WELL LOCATIONS MAY BE ADJUSTED IN FIELD BY ENGINEER. <br />3. CONTRACTOR SHALL STAKE WELL LOCATIONS AND VERIFY LOCATIONS AND ELEVATIONSARE CONSISTENT WITH THE ABOVE <br />APPROVED WELL SCHEDULE PRIOR TO DRILLING. <br />THE UNDERSIGNED HEREBY HAVE THOROUGHLY REVIEWED AND ACCEPT THE PROPOSED <br />DRY. UNG LOCATIONS AND DEPTHS. WELL INSTALLATION SHALL NOT BEGIN UNTILALL THREE <br />SIGNATURES ARE OBTAINED BELOW. <br />PROJECT ENGWEER(CBM) CHECK DATE: <br />CONTRACTOR DRILLER CHECK: DATE <br />CONTRACTOR SURVEYORS CHECK DATE- <br />* <br />ATE <br />BUTTERFLY VALVE. SEE <br />SPECS <br />HOPE FLANGE ADAPTER WITH <br />DUCTLE IRON BACKUP RING. <br />MIO GALVANIiEp PLATED <br />BOLTS, NUTS, AND WASHERS <br />HDPE HEADER (SIZE <br />IE <br />S <br />) <br />HDPE VALVE <br />SPACERS AS <br />NECESSARY <br />NOTES: <br />1. LOCATE VALVE BETWEEN FLANGES WITH APPROPRIATE <br />SPACERS AS REQUIRED. <br />2. USE HDPE VALVE SPACER OR ROUTER FLANGE ADAPTER TO <br />ALLOW VALVE TO FULLY OPEN. <br />3. INSTALL COCK VALVE WITH? GALVANIZED STREET ELBOW ON <br />BOTH SIDE OF VALVE ON HDPE HEADER <br />4 EiIXATY3NVALVE <br />W NOT TO SCALE <br />- GENERAL NOTES: <br />1. DETAILS OBTAINED FROM SAN JOAQUIN COUNTY FOR CONSISTENCY WITH ADJACENT PROJECT. <br />2. CONSTRUCTION TO BE IN ACCORDANCE WITH FOOTHILL SANITARY LANDFILL GAS SYSTEM UPGRADE PHASE 1 SPECIFICATIONS. <br />0 5/27/16 INITIAL RELEASE <br />v96F. <br />$�'1 ' <br />: _66499 <br />*',A/.1YQ61L'* <br />41 <br />AMERESCO <br />, CB&I Environmental & <br />® Infrastructure, Inc. <br />..e»wn�>n+°arrw.a..Aaww..rm,..AwaurrManm,a4An.a�.� <br />FOOTHILL SANITARY LANDFILL <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />PROJECT NO.: 631214262 <br />DATE: JUNE 2016 <br />REVISION <br />1 6/6/16 FIRSTSECOND <br />2 6/10/16 SECOND REVISION <br />DESIGNED BY: DHT <br />ORAWING NUMBER: <br />/�� <br />(v_ <br />SHEET 3 OF 4 <br />3 6/13/16 THIRD REVISIONYSAnes4an <br />2016 MODULE 1 WELL INSTALLATION <br />DETAILS <br />DRgWN BY: JJ <br />4 6 14/16 FOURTH REVISION <br />CHECKED BY: DHT <br />APPROVED BY: MA <br />REV. N0. DATE DESCRIPTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.