Laserfiche WebLink
Inspection Report 21 November 2014 <br /> Foothill Landfill <br /> San Joaquin County <br /> containment systems for expansion landfill side slopes overlapping Module I may also be <br /> affected, since they would be part of a separate unit. The tentative WDRs for the facility <br /> will need to address these and related issues. <br /> 5. Board staff is currently reviewing the design report for Module 2A, which may be approved <br /> under existing WDRs. The Discharger plans to build and start-up the module by February <br /> 2016, by which time Module 1 is expected to have reached capacity. Permitting staff will <br /> need to conduct an inspection of Module 2A during its construction period, which begins in <br /> the spring 2015. <br /> John Moody <br /> Water Resources Control Engineer <br /> Approved:_]_ <br /> - 4 - <br />