Laserfiche WebLink
Natalia Subbotnikova [EH] <br /> From: DelFrate, Todd@Waterboards <Todd.Del Frate@waterboards.ca.gov> <br /> Sent: Thursday,January 22, 2015 11:19 AM <br /> To: Taj Bahadori <br /> Cc: Robert McClellon [EH]; Natalia Subbotnikova [EH]; Michael Kith [EH];Joyesh Chandra; <br /> Michael Carroll; 'Isham,Julian'; Hold, Howard@Waterboards; Moody, <br /> John@Waterboards; Hartzell, Marty@Waterboards; DelFrate, Todd @Waterboards <br /> Subject: RE: Foothill Landfill - Compliance Well MW-6 <br /> Taj, staff approves the revised design discussed in this email with the following conditions. <br /> • Construct the well with 30 feet of well screen. To account for possible rebound of water levels, allow for 5 feet <br /> of well screen above first encountered water and 25 feet below <br /> • Collect split spoon samples every five feet through the saturated zone <br /> • If high plasticity clay or similar low-permeable material is encountered in the saturated zone at a thickness <br /> resembling an aquitard, drilling shall cease and the well shall be constructed <br /> • Centralizers should be used to properly install the well casing <br /> • Well shall be constructed to DWR well standards <br /> Please proceed with your schedule to install well MW-6. Staff will prepare a brief letter to formalize this approval. Also, <br /> please provide a start date a minimum of 48 hours in advance of the drilling. Any questions do not hesitate to call. <br /> From: Taj Bahadori [mailto:tbahadori@sjgov.org] <br /> Sent: Thursday, January 22, 2015 9:53 AM <br /> To: DelFrate,Todd@Waterboards <br /> Cc: 'Robert McClellon [EH]'; 'Natalia Subbotnikova [EH]'; 'Michael Kith [EH]'; Joyesh Chandra; Michael Carroll; 'Isham, <br /> Julian'; Hold, Howard@Waterboards <br /> Subject: Foothill Landfill - Compliance Well MW-6 <br /> Hello Todd, <br /> The County has received your letter response to our revised workplan for Well MW-6.Thank you for a quick turn-around <br /> on this,the County appreciates the CVRWQCB efforts to meet our schedule. <br /> I have discussed your response with our consultant CB&I and we have the following concerns: <br /> • It appears that the Water Board's prediction of annual water level decline is based on an average over an <br /> extended time period,as much as 17 years (1997 to 2014)for some wells. The concern for the review of that <br /> extended period of time, is the fact that the greatest annual degree of decline has occurred within the most <br /> recent period of time. This is due to the pronounced drought that has occurred in the Central Valley,which in <br /> some locations have caused recent annual water declines of over 10 feet. Attached is a spread sheet that <br /> calculates the annual water level decline between 2013 and 2014. During that period of time the annual rate of <br /> decline varied from about 2 to 2%feet. The County has proposed the multi-screen well design to take into <br /> account this ominous recent water level decline. The County's concern for future water level decline at their <br /> Foothill Landfill is not that much different from the concerns that the State Resource Control Board appears to <br /> be taking in making water allocations within the Central Valley. <br /> • The prediction of well longevity could be significantly reduced below the Water Board's prediction. It is very <br /> difficult to predict the future climate patterns for California. The County's proposed well design is based on a <br /> more conservative approach than that taken by staff of the Central Valley Water Board. <br /> 1 <br />