My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:07 AM
Creation date
1/7/2022 4:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2015
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.10 CENTRALIZERS <br /> Centralizers shall be composed of plastic or stainless steel. Galvanized steel or <br /> black iron shall not be used. <br /> 2.11 WELL PUMP <br /> Well pump shall be Groundfos Rediflo 2, single phase, 230 Volts, stainless steel <br /> submersible pump. <br /> A. Discharge Tubing <br /> Pump discharge tubing shall be polyethylene (PE) or equivalent. Tubing <br /> connections to the pump and to the well cap shall be made with stainless steel <br /> compression fittings. The tubing shall have.a stainless steel check valve <br /> installed and at the bottom. <br /> B. Motor Lead <br /> Motor lead wire shall be of appropriate gauge. The length shall be based to the <br /> i depth of each well. Lead wire shall be all-in-one, integrated with the safety cable <br /> and have electrical connectors for connection to the pump controller. <br /> C. Safety Cable Bracket <br /> Pump safety cable bracket and cable shall be stainless steel. <br /> D. Well Cap <br /> Well cap shall be of appropriate size to fit the well casing and shall have <br /> connections for the discharge tubing and the lead wire. <br /> PART 3 EXECUTION <br /> 3.01 GENERAL <br /> The actual well depth will be determined in the field by the Engineer based on the <br /> groundwater level. Contractor shall leave well bores open for a minimum of 12 <br /> hours to allow water level to stabilize before installing the well. <br /> San Joaquin County <br /> Groundwater Monitoring Well Specifications Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.