Laserfiche WebLink
Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra <Jchandra@sjgov.org> <br /> Sent: Friday,January 23, 2015 2:20 PM <br /> To: Robert McClellon [EH] <br /> Cc: Taj Bahadori; Natalia Subbotnikova [EH]; Michael Carroll <br /> Subject: Revised Well Permit Application-Foothill-GW MW-6 <br /> Attachments: FH-MW-6 GW Well Inst-Work Plan -R4-1-23-15.pdf, FH-GW Monit Well MW-6 EHD <br /> Well permit 1-23-15.pdf <br /> Hello Robert <br /> As you had requested, attached is the revised well permit application and service request form based <br /> on the new approved design by the Water Board for Foothill's groundwater monitoring well MW- <br /> 6. Attached also is the work plan with the revised well design figure 2. <br /> Well drilling will begin on February 2"d. We will confirm the date and time for EHD inspection <br /> later. Tentatively, EHD inspection is scheduled for Jan 5t" at 9:00 am. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY I PUBLIC WORKS DEPARTMENT I SOLID WASTE DIVISION <br /> PH:(209) 468-3066 1 Fax:(209) 468-3078 <br /> From: DelFrate,Todd @Waterboa rds [ma ilto:Todd.Del Frate@waterboa rds.ca.gov] <br /> Sent: Thursday, January 22, 2015 11:19 AM <br /> To: Taj Bahadori <br /> Cc: 'Robert McClellon [EH]'; 'Natalia Subbotnikova [EH]'; 'Michael Kith [EH]'; Joyesh Chandra; Michael Carroll; 'Isham, <br /> Julian'; Hold, Howard@Waterboards; Moody, John@Waterboards; Hartzell, Marty@Waterboards; DelFrate, <br /> Todd @Waterboa rds <br /> Subject: RE: Foothill Landfill - Compliance Well MW-6 <br /> Taj, staff approves the revised design discussed in this email with the following conditions. <br /> • Construct the well with 30 feet of well screen. To account for possible rebound of water levels, allow for 5 feet <br /> of well screen above first encountered water and 25 feet below <br /> • Collect split spoon samples every five feet through the saturated zone <br /> • If high plasticity clay or similar low-permeable material is encountered in the saturated zone at a thickness <br /> resembling an aquitard,drilling shall cease and the well shall be constructed <br /> • Centralizers should be used to properly install the well casing <br /> • Well shall be constructed to DWR well standards <br /> Please proceed with your schedule to install well MW-6. Staff will prepare a brief letter to formalize this approval. Also, <br /> please provide a start date a minimum of 48 hours in advance of the drilling. Any questions do not hesitate to call. <br /> From: Taj Bahadori [mailto:tbahadori@sj oq v.org] <br /> Sent: Thursday, January 22, 2015 9:53 AM <br /> To: DelFrate,Todd@Waterboards <br /> Cc: 'Robert McClellon [EH]'; 'Natalia Subbotnikova [EH]'; 'Michael Kith [EH]'; Joyesh Chandra; Michael Carroll; 'Isham, <br /> 1 <br />