Laserfiche WebLink
MONITORING WELL PLUG <br /> 2"MIN CLEAR <br /> IN ENCLOSURE WELL ENCLOSURE WITH <br /> LOCKABLE COVER,CENTERED ON BOTH <br /> PIPES <br /> "v <br /> 1/2"X4"GALV CARRIAGE BOLT IN WET <br /> CONCRETE HEAD FLUSH WI CONCRETE <br /> co 4"4 <br /> 2 FT CONCRETE PAD <br /> INSCRIBE WELL NO.AND DATE IN WET <br /> CONCRETE <br /> GROUND SURFACE LEL 214 APPROXj <br /> LL <br /> DOBIES,3 MIN <br /> CENTRALIZER(TYP). 20 FT O.0 <br /> �+ FOR AIR AND MUD ROTARY RIG INSTALLATION <br /> ONLY <br /> XO z <br /> 2 w <br /> a w <br /> o <br /> N � EAT CEMENT SEAL(TYP) <br /> N POURED IN TWO LIFTS,MAX 100 FT EA LIFT. <br /> n K <br /> Lu zo ENTONITE <br /> C3 U <br /> wnw o <br /> � z <br /> 0 <br /> x � <br /> LU Lo <br /> `o GROUNDWATER TABLE(EL 37 APPROX) <br /> SAND PACK(TYP) <br /> 4"PVC WELL CASING <br /> NOTES: <br /> 1. ACTUAL DEPTH VARIES BASED ON N 0.02"SLOTTED WELL SCREEN(TYP) <br /> ELEVATION OF GROUNDWATER <br /> 2. INSTALL TWO BOLLARDS (NOT SHOWN) 1"SLOTTED PVC SOUNDER PIPE <br /> 3. GROUNDWATER PUMP NOT SHOWN. <br /> INSTALL GROUNDWATER PUMP AS 1 ft <br /> DIRECTED BY THE ENGINEER. <br /> THREADED BOTTOM CAP <br /> 4. PRESENCE OF SAN JOAQUIN COUNTY 3/8^0 HOLE <br /> EHD IS REQUIRED FOR PLACING �--- <br /> MATERIALS WITHIN THE BOREHOLE, UP 1 1U" <br /> TO THE NEAT CEMENT SEAL. <br /> COORDINATE EHD INSPECTION WITH NOT TO SCALE <br /> THE ENGINEER. Revised Jail. 22, 2015 <br /> N:\Miscellaneous\Drawings\StdDwgs\GW Well DWG\MW-6 Workplan.dwg <br /> FOOTHILL PROPOSED GROUNDWATER <br /> COUNTY OF SAN JOAQUIN SANITARY MONITORING WELL MW-6 FIGURE 2 <br /> LANDFILL <br />