Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9 , COMMENTS <br /> New Oil : Product/Air = Piping from New Oil Tank to building <br /> New Oil /Antifreeze = Piping from Transition Sump to building <br /> New Oil Supply/Air = Piping from Transition Sump to building . <br /> Transition Sump FAILED hydrostatic test due to damaged test bells for secondary lines . <br /> Transition sump New Oil secondary and Oil /Air secondary FAILED due to damaged test bells . <br /> Transition Sump New Oil /Antifreeze secondary FAILED due to damaged test bell . <br /> New Oil Vent secondary FAILED due to damaged test bell . <br /> New Oil Supply/Air line secondary FAILED due to damaged test bell . <br /> New Oil STP Sump FAILED hydrostatic test due to damaged test bell . <br /> RECEIVELI <br /> FEB 2 5 2022 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/ SERVICES <br /> All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section . <br /> Page 5 of 5 <br />