Laserfiche WebLink
CalRecycle <br />Disposal Facility Inspection Report (52) <br />59-:00ROWLcounty of San Joaquin <br />39 -AA -0004 6/24/2015 LEA Periodic <br />Tlme to Time oii��� � � � <br />1nslpeatia� T <br />Recewedy� `., <br />._. 4 . <br />I w <br />Foothill Sanitary Landfill <br />Foothill Sanitary Landfill Inc <br />FaI�,Illty LaE;�1'�Ian '� Z �L✓ t i � S II ,. , I II <br />� a <br />gWrier, 1'4R{m7—f S ` 4 � lil l <br />If r r. <br />� c 1 III l <br />6484 North Waverly Road, Linden <br />95236 <br />Cnspectar <br />Alsojen (Mame) tlllliyu <br />iw <br />, .. .,w <br />Robert McClellon <br />jJesse Padilla <br />THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 30 OF THE PUBLIC RESOURCES CODE (PRC) AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS (CCR) <br />Flla o _. r IAI'eaSOf4d"ncern°>. <br />o ations :o <br />I#%^III.. <br />X 21640 - Title 27 Full permit review <br />Comments: The facility is due for the 5 -year. A letter notifying the operator of the 5 year permit review <br />requirement was emailed to the Engineer at Solid Waste Division on April 23, 2015. The letter was again emailed <br />to the Engineer of Solid Waste Division on June 3, 2015. The EHD has a not received a permit package as of <br />today. The facility is also due for the non -water corrective action cost estimate. The package needs to be <br />submitted to the EHD prior to October 2015. The permit review must be completed by that date. Failure to <br />submit the permit package prior to the next routine inspection will result in a violation. <br />Y . I <br />A routine inspection was conducted this date and the following was noted. <br />1. The site is using soil and tarps as cover. The cover met state minimum standards. <br />2. The active area is getting confined. Safety is a concern. Remove all unnecessary equipment and storage containers to <br />the entrance gate area. <br />3. Construction of the new landfill cell is in full swing. <br />4. Onsite Litter was minimal. <br />5. No landfill gas monitoring conducted during this inspection <br />