My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
1600 - Food Program
>
PR0538752
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:37:02 PM
Creation date
1/11/2022 10:14:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0538752
PE
1624
FACILITY_ID
FA0022252
FACILITY_NAME
STARBUCKS COFFEE #20685
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPEED FLEX PER <br /> MANUFACTURERS <br /> TYP. INSTALLATION DETAIL G_ <br /> ECO-GRIP FLOORING; �vO <br /> SEE 1105 FOR MORE O `` <br /> 'C ) <br /> INFORMATION `_ <br /> FOODCASE � BULLNOSE SANITARY K-:1` `v R <br /> APPROVED SUBSTRATE 3/8" COVED TILE BASE P��" <br /> ° <br /> 2020 STARBUCKS OFFEE COMPANY <br /> AS REQUIRED THINSET <br /> °a <br /> ` <br /> e,•, <br /> aabe <br /> STAR <br /> BUC <br /> KWALL ANDECO-GRIP EPDXY ADHESIVE CLEAR SILICONE SEALANT SHEATHING WALL TILE PER PLAN <br /> AS REQUIRED 2401 UTAH AVENUE SOUTH <br /> PER PLAN SEATTLE, WASHINGTON 9813 <br /> 4FINISH FLOOR PER SCHEDULE STAINLESS STAPLE COVE 0 318-1575 <br /> a <br /> ° e <br /> ° <br /> - . - _=• ro -° e ° _ _ - dOR POWDER COATED <br /> FASTENER THESE DRAWINGS AND THE PROJECT MANUAL <br /> ECO-GRIP ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> SEALANT ECO-GRIP BASE SOLE PROPERTY OF STARBUCKS <br /> TYPICAL AT TYPICAL AT CAP. COLOR TO CORPORATION, WHICH IS THE OWNER OF THE <br /> BACKBAR SIDES FRONTBAR SIDES MATCH ECO-GRIP COPYRIGHT IN THIS WORK. THEY SHALL NOT BE <br /> FLOORING REPRODUCED (IN WHOLE OR IN PART), SHARED <br /> WITH THIRD PARTIES IN ANY <br /> ECO GRIP - CONC. CURB FOOD CASE ON OTHER PROJEC SOORU XSED TENS O SnANNER TO THIS <br /> 14 PROJECT WITHOUT THE PRIOR WRITTEN <br /> Scale: 3"= 1'-0" <br /> CONSENT OF STARBUCKS CORPORATION. <br /> THESE DRAWINGS AND SPECIFICATIONS ARE <br /> INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> ECO-GRIP PROTOTYPICAL STARBUCKS STORE (WHICH IS <br /> EPDXY SUBJECT TO CHANGE AT ANYTIME)AND DO NOT <br /> ADHESIVE REFLECT ACTUAL SITE CONDITIONS. NEITHER <br /> 6" (150MM) +/-TYP. A.F.F. PARTY SHALL HAVE ANY OBLIGATION NOR <br /> CONCRETE LIABILITY TO THE OTHER (EXCEPT STATED <br /> ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY <br /> 1/4" SLAB <br /> MOP SINK (6MM) ECO-GRIP CABINET TOE-KICK OVERHANG EXECUTED BY BOTH PARTIES. <br /> ` `��O ROUTED ECO-GRIP SEALANT <br /> VE STAINLESS STAPLE OR POWDER STARBUCKS TEMPLATE VERSION: 12020-01-31.1 <br /> 1/4' (6MM) ECO-GRIP V CO FLOORING <br /> O COATED FASTENER <br /> SPEEDFLEX A` ARCHITECT OF RECORD <br /> ` ---- ECO-GRIP BASE CAP. COLOR TO o <br /> ECO-GRIP ` ��v MATCH ECO-GRIP FLOORING � • <br /> FLOORING O 9 e_ <br /> ECO-GRIP EPDXY a° d e INSTALL CASEWORK BASE PRIOR " <br /> TO ECO-GRIP FLOORING <br /> ADHESIVE <br /> CONCRETE SLAB CONCRETE SLAB <br /> ECO-GRIP mcg a r c h i t e c u r e <br /> ECO-GRIP FLOORING 15635 Alton Parkway, Suite 100, Irvine, CA 92618 <br /> ` EPDXY P:949.553.1117 F:949.474.7056 <br /> 'C ADHESIVE — 1/4" (6MM) <br /> ROUTED COVE ARCHITECT STAMP <br /> _ Q <br /> -d <br /> - 1839 `. <br /> 13 <br /> ECO GRIP AT MOP SINK 7 ECO-GRIP BASE CAP WITH TILED WALL 3 ECO-GRIP BASE AT CABINET FRONT <br /> Scale: 12 - 1 -0 scale: 6 - 1 -0 Scale: 6 - 1 -0 <br /> F CALIFO <br /> ECO-GRIP COLOR <br /> MATCHED SPEEDFLEX. <br /> SLOPE TO FLOOR SINK <br /> CONCRETE <br /> SLAB --- 1/8" (3MM)GAP BETWEEN <br /> � ECO-GRIP ECO-GRIP FLOORING AND FIXTURE 0 <br /> FRP WALL FLOORING SLIMFOOT TILE BASE +-+ J <br /> FLOOR SINK AND GRATE <br /> E WALL AND COVERING SLOPE O O z <br /> �I SHEATHING <br /> CAFE BAR N <br /> � PER PLAN STAINLESS STAPLE � z � O <br /> OR POWDER COATED <br /> LQ <br /> UIFASTENER _ _ — CONCRETE FLOORING .— <br /> _ BAR FINISH BAR DIEWALL U <br /> O °e ae 4 <br /> e ° <br /> e ° <br /> = ECO-GRIP ECO-GRIP BASE PANEL <br /> < 0Z <br /> _ ° <br /> STAINLESS STAPLE (a _ <br /> SEALANT CAP. COLOR TO g 8 ° ,: a e `e °'° '_ OR POWDER COATED a°° e° '� W Z <br /> MATCH ECO-GRIP ° <br /> ° STEEL FASTENER ° °d _ -p9' - W <br /> FLOORING a° ° a : d 0 <br /> z <br /> ECO-GRIP EPDXY d Q p m O Q <br /> m ADHESIVE z Q <br /> 06 I— A � O <br /> co 1ECO-GRIP BASE CAP. U W U U � <br /> ECO GRIP TO FLOOR SINK TRANSITION COLOR TO MATCH O z <br /> u71 9 ECO-GRIP - ECO-GRIP FLOORING TILE BASE - INTERIOR WALL ° ° o Q <br /> op scale: 12 = 1'-0" SEALANT <br /> m ECO-GRIP <br /> INSTALL CASEWORK <br /> NO EPDXY DIEWALL PRIOR TO � scale: 3" = 1'-0" � � � <br /> XI ADHESIVE _ ECO-GRIP FLOORING z <br /> m ECO-GRIP EPDXY STORE #: 20685 <br /> �I CONCRETE ADHESIVE PROJECT #: 59335-039 <br /> 1/4" <br /> SLAB BASE AND CONCRETE SLAB ISSUE DATE: CHECKSET <br /> N (6MM) FLOORING PER ECO-GRIP DESIGN MANAGER: J.RAMOS <br /> ROUTED ECO-GRIP SPEED FLEX PER SCHEDULE PRODUCTION DESIGNER: S.KIM <br /> COVE FLOORING MANUFACTURERS SPEED FLEX PER FLOORING CHECKED BY: <br /> N TYP. DETAIL MANUFACTURERS 1/4" (6MM) <br /> E O MCG PROJECT#: 21324 <br /> TYP. DETAIL ROUTED <br /> UCOVE J� MCG PROJ. MANAGER: J.SPENCER <br /> p _ d O'C MCG PROJ. SPECIALIST: S.KIM <br /> ° e e <br /> d <br /> `A``► <br /> Revision Schedule <br /> ECO-GRIP FLOORING; �V <br /> / <br /> ° SEE 1105 FOR MORE �1 Rev Date By Description <br /> e. INFORMATION 'C�O <br /> 2 <br /> U f APPROVED SUBSTRATE <br /> e AS REQUIRED !'P <br /> e <br /> d• - P <br /> _ ECO-GRIP EPDXY CJ <br /> 75 ADHESIVE AS REQUIRED <br /> D_ SHEET TITLE: <br /> ROUTED COVE <br /> FLOOR FINISH DETAILS <br /> SCALE: AS SHOWN <br /> N <br /> O <br /> ECO-GRIP BASE CAP WITH FRP �S.al.- <br /> GRIP - CONC. CURB, RO SYSTEM ECO-GRIP BASE AT BAR DIEWALL SHEET NUMBER: <br /> Q <br /> V <br /> 1?��Scae "= 1'-0" 1'-0" 1501 <br /> Scale: 6"= 1'-0" <br />
The URL can be used to link to this page
Your browser does not support the video tag.