Laserfiche WebLink
KEYED NOTES: .. <br /> OWATER HAMMER ARRESTORS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH <br /> THE MANUFACTURER'S RECOMMENDATIONS. LOCATIONS SHOWN ARE FOR REFERENCE <br /> PURPOSES ONLY. <br /> CO 2020 STARBUCKS COFFEE COMPANY <br /> S I ARBUCKS 0 <br /> 2401 UTAH AVENUE SOUTH <br /> SEATTLE, WASHINGTON 98134 <br /> (206) 318-1575 <br /> THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> SOLE PROPERTY OF STARBUCKS <br /> CORPORATION,WHICH IS THE OWNER OF THE <br /> COPYRIGHT IN THIS WORK. THEY SHALL NOT BE <br /> REPRODUCED(IN WHOLE OR IN PART), SHARED <br /> WITH THIRD PARTIES OR USED IN ANY MANNER <br /> ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> PROJECT WITHOUT THE PRIOR WRITTEN <br /> CONSENT OF STARBUCKS CORPORATION. <br /> THESE DRAWINGS AND SPECIFICATIONS ARE <br /> INTENDED TO EXPRESS DESIGN INTENT FORA <br /> PROTOTYPICAL STARBUCKS STORE(WHICH IS <br /> SUBJECT TO CHANGE AT ANYTIME)AND DO NOT <br /> REFLECT ACTUAL SITE CONDITIONS. NEITHER <br /> PARTY SHALL HAVE ANY OBLIGATIONN R <br /> LIABILITY TO THE OTHEREXCEPT STATED <br /> ( <br /> * , ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY <br /> EXECUTED BY BOTH PARTIES. <br /> STARBUCKS TEMPLATE VERSION: i2020-01-31.1 <br /> OF <br /> _ <br /> ARCHITECT OF RECORD <br /> } o <br /> vv <br /> cc o Z <br /> ate: <br /> - LL <br /> ' r <br /> v _ <br /> VJ <br /> v _ <br /> mcg arc itecure <br /> 15635 Alton Parkway,Suite 100, Irvine,CA 92618 <br /> _ ARCHITECT STAMP <br /> / r <br /> r------------------ <br /> 112 <br /> / <br /> 3 <br /> 4 <br /> _ O <br /> 11-19-21 <br /> .. 1 <br /> rr <br /> rY�c <br /> 1 2 <br /> v <br /> te`y- <br /> ...................... <br /> - ...... .... ...... <br /> ..... <br /> t <br /> v <br /> J14 <br /> / <br /> 112 <br /> 04 <br /> v _ v <br /> O 07 <br /> --- — - — <br /> : <br /> r- <br /> U <br /> y m <br /> - <br /> £ '" <br /> M <br /> U U <br /> s o W W r <br /> : <br /> 4 ' r <br /> STORE #: 20685 <br /> PROJECT#: 59335-039 <br /> . ✓ <br /> ISSUE DATE: CHECKSET <br /> rr DESIGN MANAGER: J.RAMOS <br /> r <br /> PRODUCTION DESIGNER: <br /> CHECKED BY: GRS <br /> MCG PROJECT#: 21324 <br /> :. MCG PROJ. MANAGER: J.SPENCER <br /> MCG PROJ. SPECIALIST: <br /> Revision Schedule <br /> --- Rev Date By Description <br /> SHEET TITLE: <br /> PLUMBING RISER <br /> DIAGRAM <br /> SCALE:AS SHOWN <br /> SUPPLY RISER DIAGRAM SHEET NUMBER: <br /> 1 N.T.S. P-1 104 <br />