Laserfiche WebLink
SYMBOLSABBREVIATIONSSPECIFICATIONSTHE CONTRACTOR SHALL ENGAGE A PROFESSIONAL COMMISSIONING THIRD PARTY AGENT ORCONSLTANTCERTIFIED TO PERFORM THE MEP SYSTEMS COMMISSIONING AND TO PROIDEA REPORT FOR ALL FNCTIONAL PEFORMANCE TESTS COMPLETED AS PART OF THEACCEPTANCE TEST PROCESSTHE LIGHTING CONTROLS ACCEPTANCE TEST TECHNICIANSSHALL E CERTIFIED THRAN APPROED TRAINING PROGRAMAND REGISTERED ITHINTHE STATE OF CALIFORNIAILDING COMMISSIONING REIREMENTS SHALL E MET ASOTLINED IN THE 21TITLE 2STANDARDSSECTION 12THE FOLLOING SYSTEMSMST NDERGO ACCEPTANCE TESTING1ATOMATIC DAYLIGHTING CONTROLS2ATOMATIC TIME SITCH CONTROLSOCCPANCY SENSORSOTDOOR LIGHTING SHTOFF CONTROLSMLTILEEL DIMMING CONTROLSAPPLICABLE CODESCOMMISIONING AND ACCEPTANCE TESTING:E1.0SYMBOLS,NOTES, ANDSPECIFICATIONS5860 W. Las Positas Boulevard, Suite 15 <br />Pleasanton, California 94588 <br />phone: (925) 621-5300 fax: (925) 474-2159 <br />belden@beldeninc.comSHEET INDEXSheet NumberSheet Title