My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:17:13 AM
Creation date
1/11/2022 1:18:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
PACIFIC SERVICE STATION
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Address Pacific Service Station, 6131 Pacific Avenue, Stockton CA 95207 Record ID PR0231223 <br /> Date 8/25/2022 Program: UST <br /> PHOTO 1: <br /> Incorrect secondary containment test date listed in the designated operator report. <br /> Designated UST Operator visual n1aNu....•. - <br /> Date last <br /> Yes No NA performed <br /> 10.TESTING AND MAINTENANCE <br /> ❑✓ ❑ 08/11/21 <br /> Has monitoring system certification been completed within the past <br /> 12 months? 8/11/21 <br /> Has spill container testing been completed within the past ❑✓ <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within 8/11/21 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past El El 08-26-20 <br /> 36 months? <br /> Has tank tightness testing been completed within required ❑ 1 ❑✓ <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? El 0 <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: H H W <br /> Other Test/Maintenance: Li -[7-W <br /> F- <br /> 11.FACILITY EMPLOYEE TRAINING No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? E <br /> 13.COMMENTS <br /> This section maybe used to record comments or observations that are not current compliance <br /> deficiencies. <br /> vers marked <br /> "No" <br /> must be described by the designated UST <br /> operator In Section ; <br /> Gabriela Garcia-Mejia, EHS Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.