Laserfiche WebLink
Underground Storage Tank <br />Designated UST Operator Visual Inspection Report <br />All answers marked “No” must be described by the designated UST operator in Section 3. <br />Page 4 of 4 <br /> <br /> <br /> <br /> <br />10. TESTING AND MAINTENANCE Yes No NA <br />Date last <br />performed <br />Has monitoring system certification been completed within the past <br />12 months? <br />Has spill container testing been completed within the past <br />12 months? <br />Has overfill prevention equipment inspection been completed within <br />the past 36 months? <br />Has secondary containment testing been completed within the past <br />36 months? <br />Has tank tightness testing been completed within required <br />timeframes? <br />Has line tightness testing been completed within the required <br />timeframes? <br />Other Test / Maintenance: <br />Other Test / Maintenance: <br />Other Test / Maintenance: <br />11. FACILITY EMPLOYEE TRAINING Yes No <br />Have all individuals performing facility employee duties received the required facility <br />employee training within the past 12 months? <br />13. COMMENTS <br />This section may be used to record comments or observations that are not current compliance <br />deficiencies. <br />