Laserfiche WebLink
Underground Storage Tank <br />Designated UST Operator Visual Inspection Report <br />All answers marked “No” must be described by the designated UST operator in Section 3. <br />Page 3 of 4 <br />9. UST SYSTEM INSPECTION <br />List below and in Section 3 all containment sumps that have had a release detection alarm <br />since the previous Designated UST Operator Inspection Report and have not been responded <br />to by a qualified service technician. Containment sumps listed below require a visual <br />inspection for damage, water, debris, hazardous substance, and proper sensor location. <br />Is the containment sump free of damage, water, debris, and hazardous substances? <br />Containment Sump ID Yes No Containment Sump ID Yes No <br /> <br /> <br />Are all sensors in visually inspected containment sumps located to detect a release at <br />the earliest opportunity? <br />Is the spill containment free of damage, water, debris, and hazardous substances? <br />Is the fill pipe free of obstructions? Is fill cap securely on the fill pipe? <br />Spill Containment ID Yes No Spill Containment ID Yes No <br />Is the UDC free of damage, water, debris, and hazardous substances and all sensors located <br />to detect a release at the earliest opportunity?No UDC(s) at this facility <br />UDC ID Yes No UDC ID Yes No <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Mechanical float mechanisms used in UDCs.