Laserfiche WebLink
Underground Storage Tank <br /> Overrill Prevention Equipment Inspection Report <br /> 1 .6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1: 87 S T2: 87 M T3: Diesel T4: 91 <br /> Are both vent and tank riser piping E Yes E Yes E Yes E Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model FFS 708692 FFS708692 FFS708692 FFS708692 <br /> What is the OPE response when E Shut off E Shut off E Shut off E Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? E No E No E No E No <br /> At what level in the tank is the OPE set to 80" 80" 80" 80" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 94.75 94.75 94.75 94.75 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to E Yes E Yes E Yes E Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results E Pass E Pass E Pass E Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />