Laserfiche WebLink
3ENERAL CONSIDERATIONS : <br /> 1. Does it appear that any environmental feature of the project <br /> will generate significant public concern or controversy? <br /> ( ) Yes No Nature of concern(s) : <br /> 2 . Will the project require approval or permits by agencies other <br /> than the County? ( ) Yes (V) No <br /> Agency name(s) : <br /> 3 . Is the project within the Sphere of Influence, or within two <br /> miles , of any city? <br /> ( ) Yes No City: <br /> ENVIRONMENTAL IMPACTS: <br /> "Yes" may only be checked in situations where there is substantial evidence to <br /> indicate that there may be a significant adverse impact on the environment -if <br /> there is no change in the project description. (CECA Guidelines, Sec. 15064) <br /> See the "DiscussicnC section at the end of the Initial Study for explanation of <br /> any impacts checked"Yes", or any "No" answer marked with an asterisk <br /> Sources. The following sources of information have been used in determining <br /> environmental impacts: <br /> original source materials and maps on file in the Community Development <br /> Department including: all County and City general plans and community plans; <br /> assessor parcel books; various local and FEMA flood zone maps; service district <br /> maps; maps of geologic i.rtstability; maps and reports on endangered species such <br /> as the Natural Diversity Data Base; noise contour maps; specific roadway plans; <br /> ma,DF and/or records of archeological/historic resources; soil reports and maps; <br /> etc. Many of these original source materials have been collected from other <br /> public agencies or from previously prepared EIR' s and other technical studies. <br /> Additional standard sources which should be specifically cited below include <br /> and <br /> on-site visits by staff (note date) ; staff knowledge or experience; <br /> art of the project <br /> independent environmental studies submitted to the County as p <br /> i <br /> application (note report title, date, and consultant) . <br /> YES NO <br /> 1. WATER <br /> a. Is any portion of the project <br /> subject to flood hazard? <br /> Flood zone <br /> (Rev: 01/91) <br /> Initial Study <br /> -19- <br />