My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 8:17:39 AM
Creation date
1/11/2022 1:39:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7000 North Michael Canlis Blvd. PR0232437 <br /> January 7, 2022 Program: UST <br /> PHOTO 2: Incorrect test dates on DO re orts. <br /> Underground storage Tank <br /> Designated UST operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Date last <br /> Has monitoring system certificationYes No NA performed <br /> 12 months? been completed within the past <br /> Has spill container testing been completed within the past 01122121 r <br /> 12 months? 01122121 ✓ <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? ® El <br /> 10111118 <br /> Has secondary containment testing been completed within the past ® E E <br /> 36 months? 08129118 <br /> Has tank tightness testing been completed within required ® E E 04121109 <br /> timeframes? <br /> Has line tightness testing been completed within the required E E <br /> timeframes? <br /> Other Test/Maintenance: E E E <br /> Other Test/Maintenance: ® E E <br /> Other Test/Maintenance: ® E E I <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> 1I Have all individuals performing facility employee duties received the required facility E <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> SB989 Secondary Containment Testing Due 0812912021 Date Last Performed:08129118 <br /> Overfill Prevention Inspection Due 06/01/2021 Date Last Performed:10111118 <br /> All answers marked"No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br /> Lydia Baker, SR. REHS Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.