Laserfiche WebLink
Proposed <br />Operations and Revised <br />Permit <br />Include the processing of commercial food waste inside the <br />MRF building, or • building on • produce c• • • 1 <br />digestionfeedstock and/or anaerobic <br />A•!' a I megawatt••• waste biomass gasification • . <br />Sunday;Increase the permitted hours of the facility for processing of <br />materials in the MRF building to 24 hours daily, Monday — <br />Increase the permitted • of • outdoor <br />processing rils — <br />Sunday <br />Increase r it hours for public receipt materials <br />. t — Saturday. <br />