Laserfiche WebLink
Transfer/Processing Report <br />Tracy Materia/ Recovery & Transfer Facility <br />30703 5 MacArthur Drive, Tracy, California 95377 <br />This Transfer/Processing Report (TPR) is the operations plan and permitting <br />document to revise the existing Full Solid Waste Facilities Permit (SWFP)(SWIS <br />No. 39 -AA -0024) for the Tracy Material Recovery & Transfer Facility (MRF). A TPR <br />is required by the California Code of Regulations (CCR), Title 14, Section 18221.6, <br />to describe the operations of a facility in order to obtain a Full Solid Waste Facilities <br />Permit (SWFP); it describes in detail the operations of the MRF and identifies <br />operational changes requiring the revision of the SWFP. The purpose of the TPR is <br />to identify design features and operation plans that mitigate or control potentially <br />adverse environmental impacts while providing information demonstrating on how <br />the Facility complies with state minimum standards. <br />The operator, Tracy Material Recovery & Solid Waste Transfer, Inc. (Tracy) <br />seeks to expand the existing permitted operations at the MRF, as allowed by the <br />Solid Waste Facility Permit, by making the following operational changes that <br />would be declared to be significant by the California Department of Resources, <br />Recycling, and Recovery (CalRecycle): <br />• Increase the tonnage to 1,800 TPD to meet the needs of AB 32 for City of <br />Tracy and San Joaquin County <br />• Expand programs to accommodate the AB 341 mandate of providing <br />commercial recycling to all business and multi -family units <br />• Expand the outdoor green waste processing operations to allow the <br />processing of co -collected residential green waste with food waste, to <br />produce compost feedstock and/or anaerobic digestion feedstock <br />• Include the processing of commercial food waste inside the MRF building <br />to produce compost feedstock and/or anaerobic digestion feedstock <br />• Add a 1 mega -watt wood waste biomass gasification plant <br />• Increase the permitted hours of the facility for processing of materials in <br />the MRF building to 24 hours daily, Monday — Sunday; <br />The Solid Waste Facility Permit would not be increased with respect to the <br />currently -permitted hours for receipt of waste at the facility for either the <br />commercial operations (4:00 A.M. — 6:00 P.M. daily) or public (6:00 A.M. — 6:00 <br />P.M. daily). <br />