Laserfiche WebLink
k <br /> Proposed Operations aiPermit <br /> f. <br /> I <br /> (cont. ) <br /> • Include the processing of commercial food waste inside the <br /> F building, or another building on site, to produce compost <br /> feedstock and/or anaerobic digestion feedstock; <br /> Add a 1 megawatt wood waste biomass gasification plant; <br /> • Increase the permitted hours of the facility for processing <br /> materials in the MRF building to 24 hours daily, Mon — <br /> Sunay; <br /> • Increase the permitted hours of the facility for outdoor <br /> processing of materials t a.m. t ., Monday — <br /> I <br /> Sunday <br /> Increase the permitted hours for public receipt of materials to <br /> a. m. to 6:00 p.m., Monday — Saturday. <br />