Laserfiche WebLink
1 <br /> Transfer/Processing Report <br /> Tracy Material Remvery&TransferFad7dy <br /> 30703 .5 MacArthurdrive,,Tracy,Califumb 95377 <br /> PREFACE <br /> This Transfer/Processing Report (TPR) is the operations plan and permitting <br /> document to revise the existing Full' Solid Waste Facilities Permit (SWFP)(SI <br /> No. 39-AA-0024)for the Tracy Material Recovery&Transfer Facility (MRF).A TPR <br /> is required by the California Code of Regulations (CCR), Title 14, Section 18221.6, <br /> to describe the operations of a facility in order to obtain a Full Solid Waste Facilities <br /> Permit (SWFP); it describes in detail the operations of the MRF and identifies <br /> operational changes requiring the revision of the SWFP.The purpose of the TPR is <br /> to identify design features and operation plans that mitigate or control potentially <br /> adverse environmental impacts while providing information demonstrating on how <br /> *the Facilityy complies with state minimum standards. <br /> The operator, Tracy Material Recovery & Solid Waste Transfer, inG. (Tracy) <br /> seeks to expand the existing permitted operations at the MRF, as allowed by the <br /> Solid Waste Facility Permit, by making the following operational changes that <br /> would be declared to be significant by the California Department of Resources, <br /> Recycling, and Recovery(CalRecycte): <br /> increase the tonnage to 1,800 TPD to meet the needs of AB 32 for City of <br /> Tracy and San Joaquin County <br /> • Expand programs to accommodate the AS 341 mandate of providing <br /> commercial recycling to all business and multi-family units <br /> • Expand the outdoor green waste processing operations to allow the <br /> processing of co-collected residential green waste with food waste, to <br /> produce compost feedstock and/or anaerobic digestion feedstock <br /> Include the processing.of commercial food waste inside the MRF building <br /> to produce compost feedstock and/or anaerobic digestion feedstock <br /> • Add a 1 mega-watt wood waste biomass gasification plant <br /> Increase the permitted hours of the facility for processing of materials in <br /> the MRF building to 24 hours daily, Monday v Sunday; <br /> The Solid Waste Facility Permit would not be increased with respect to the <br /> currently-permitted hours for receipt of waste at the facility for either the <br /> commercial operations (4:00 A.M. - 6:00 P.M. daily) or public (6:00 A.M. -• <br /> P.M. daily). rlrw <br /> iii <br />