My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 10:28:00 AM
Creation date
1/12/2022 9:36:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013-2016
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> t. Additional information concerning the design and operation of the facility shall be famished upon request and within the time frame <br /> specified by the LEA. <br /> u. The maximum permitted daily tonnage for this facility is 1,800 tons per day,and shall not receive more than this amount without <br /> a revision of this permit. <br /> v. The proposed bio-mass operation shall process wood waste as described in the TPR. <br /> w. This facility shall not exceed the maximum daily traffic count of 1,245 trips per day without revision this permit. <br /> x. Food waste shall not exceed more than 15%of the co-composted elongated windrows and shall not exceed more than 40%of the <br /> material composed in the enclosed or aerated static piles. <br /> y. A copy of this permit shall be maintained at the facility. <br /> z. A noise study shall be required in the event that complaints are received by the LEA regarding the noise generated by the facility <br /> operations.The noise study would need to be conducted within 180 days of the first verified complaints. <br /> aa. The LEA must be notified in writing 7 days in advance of non-routine changes in operations at this facility. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.