My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:13:59 AM
Creation date
1/12/2022 2:26:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> Q Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> El 3 GPH 0.1 GPH 17 0.2 GPH <br /> Has the testing apparatus been properly calibrated? © El El <br /> For emergency generator tank systems, does the LLD create an audible and visual <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is E ED El <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the E 0 <br /> ri <br /> monitoring system_is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected © 0 El <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Ej <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> LLD 1D LLD Model Lines Monitored Pass Fail <br /> Q1 848480 87 El <br /> 02 848480 91 El El <br /> Q# 848480 DSL El r <br /> El <br /> ® El <br /> El El <br /> C r <br /> El r] <br /> El <br /> El <br /> Describe all answers marked "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.