Laserfiche WebLink
5y Dipstick number(X)=82" top of the Face Seal Adaptor in the spill container to the <br /> Tank diameter(Y)=92" bottom of the tank(Dim."B"), <br /> (Y)-N= W (92"-2"= 10") IMPORTANT:Inspect the riser pipe for any foreign mate- <br /> (Z)= 10" rial. Over spray from tank relining or any internal burrs <br /> 6) (Z)-2"=C 0 o"-2"=8") inside of pipe must be removed prior to installation. <br /> C=8" Failure to have an unobstructed riser pipe may prevent <br /> 7) Is 8"less than 6-1120? proper installation and operation of the valve. The <br /> 71 SO is designed for installation into schedule 40 riser <br /> pipes. The 71 SO cannot be installed into schedule 80 <br /> NO Measure the distance from the top of the FSA- riser pipes, <br /> 400 Face Seal Adaptor installed on the riser pipe <br /> to the inside,top lip of the storage tank and ob- STEP 2: MARK THE TUBE <br /> tain measurement(A). Use the result from Step 1 and HOWTO LOCATE THE <br /> POSITION OF THE 71 SO AT 9595 TANK CAPACITY to <br /> Upper tube length=C+(A) mark the upper tube. Measure the distance from the <br /> seam where the upper tube and valve body meet. Use <br /> For testable models only,ending in"T": Upper Tulse a tape measure to mark the calculated upper tube <br /> Length=C+(A)- 7•-712" length onto the upper tube. See Figure 2- <br /> ASSEMBLY <br /> ASSEMBLY INSTRUCTIONS Tape measure <br /> IMPORTANT: Each of the numbered steps in the in- <br /> stallation instructions are designed as a CHECK l-ISTto <br /> ensure proper installation and trouble free operation of <br /> the OPW 71 SO Overfill Prevention Valve. <br /> Read and follow these steps carefully,checking them Riser Pipe <br /> off as you proceed. with Face (A) <br /> Seal Adaptor To Tank <br /> B <br /> Figure numbers correspond to step numbers for easy TOp(i.D•) To Tank <br /> reference. 8U° om <br /> STEP is MEASURE <br /> Install tate OPW Face Seal Adaptor and the OPW Thread- <br /> on Spill Container on the Fill Riser(Refer to the Installa- <br /> tion Instructions Supplied with the Spill Container). In- Figure 7 <br /> serf a tape measure through the riser pipe and hook it <br /> under the inside of the tank in the lengthwise direction. <br /> Measure the distance from thetopof the Face Seal <br /> Adaptor threads inside the base of the spill container <br /> bucket just below the drain valve outlet window to the 4°NFT <br /> inside,top lip of the storage tank(Dim, "A") (See Figure Nipple <br /> 1 WA). <br /> The top flange on the 71 SO will rest on the Face Seal <br /> Adaptor just below the drain valve outlet,and be <br /> locked in place between the Face Seal Adaptor and the ° OPW Spill <br /> 4"nipple that is installed in the spill container with the Container <br /> Jack Screw Kit(See Figure 1A). (For riser pipe configura- Jack Screw <br /> tions other than that shown,consult installation draw- Measu'for Jack Spto ew he Kit <br /> ings or use other necessary means to measure pimen- instalisfio„ O.Ring Seal <br /> cion"A"). {Top ct Face <br /> saai Adarkc*} Face Seal <br /> Using a tape measure,measure the distance from the 71St) Adaptor <br /> Figure 7A s <br />