Laserfiche WebLink
11. Please include a copy of any studies (soils, geology, marketing, <br />etc.) that you may have had prepared for this project or project <br />site. <br />C. -PROJECT CHARACTERISTICS <br />1.. Services: Indicate how the following services will be provided <br />for your project and availability of service. <br />a. <br />Water <br />Supply: IM <br />n, v. Du At_ wrZlL_S <br />e. <br />b. <br />Sewage <br />Disposal:_�/s <br />u� - Scy 71(. <br />J-APJ < <br />C. <br />Storm <br />Drainage: <br />i7, rc�{i.�b q,._o" <br />puectc ROAD <br />If an extension of any of the above is necessary, indicate <br />which service(s), what agency will be providing the <br />service(s), and the distance of the extension(s): <br />�lJou,� <br />d. <br />Natural Gas: <br />7qou2 <br />e. <br />Electricity: <br />pa+i <br />f. <br />Road/Access <br />(i.e., paved, <br />unpaved, public/private, road name): <br />_ OAU& ZD <br />%► pus3Lf4 <br />R"An ro dL Co,�a rye JCa"GD <br />g. <br />Fire: 4 <br />Distance_to <br />nearest fire station: <br />h. <br />Schools : . <br />t e , �c <br />I . .. <br />2. Describe any site alterations which result from the proposed pro- <br />ject (specifically address the amount and location of grading, <br />cuts and fills, vegetation removal, alterations to drainage, <br />removal of existing structures, number of trees removed, etc.). <br />3. Air Quality Information: <br />Number and type of vehicles associated with completed project <br />IN RASVC . Cp*e J¢f iC_i,� ., 2 �Q. �s.� aetP ►..a �sc� <br />Types of emissions and sources associated with project <br />Fuel sources (and amounts) to be consumed by or as a result of the <br />completed project_ ,Um,o,t <br />Will the project result in substantial air emissions or deteriora- <br />tion of ambient air quality? ✓ NO — YES <br />4. How much agricultural land will be removed from production? <br />1 -ro 2 A�_ 1PUtleAra n <br />Irrigated Not irrigated <br />Major Subdivision <br />(6/86) <br />-,. ?. - � .r <br />