Laserfiche WebLink
The following is an itemized list of hazardous materials violations that have not been <br /> addressed for Altamont Corridor Express Maintenance Facility as of January 18 , <br /> 2022 . <br /> Open violations from August 05, 2021 inspection <br /> Violation #4 - Failed to electronically submit the Business Activities or Owner/Operator Identification page. <br /> OBSERVATION The Business Owner/Operator Identification form was not updated . Tony Garcia is listed as the <br /> primary emergency contact and is no longer with the facility. <br /> REGULATION GUIDANCE: This information must be current and submitted as part of the business plan . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS) at <br /> http : //cers. calepa . ca . gov/, enter the correct or updated information , and submit to the EHD for approval . <br /> ❑ This violation was corrected 11This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #6 - Failed to electronically submit a site map with all required content. <br /> OBSERVATION The site map is incomplete . The follow items are missing : <br /> -The oil water separator building detail map is illegible in some areas <br /> - Loading areas ( diesel generator and diesel tank for fire pump) are missing from the map <br /> REGULATION GUIDANCE: Asite map shall contain a north orientation , loading areas , internal roads , adjacent <br /> streets , storm and sewer drains , access and exit points , emergency shutoffs , evacuation staging areas , hazardous <br /> material handling and storage areas , and emergency response equipment. <br /> If a site map element is not applicable for your facility then list it on the map and label as " NA" . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS) at <br /> http : //cers. calepa . ca . gov/, upload the correct or updated information , and submit to the EHD for approval . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 3 <br />