Laserfiche WebLink
Underground Storage Tank <br /> Overrill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DSL <br /> Are both vent and tank riser piping M Yes El Yes ® Yes I] Yes <br /> secondarily contained? Ij No Ej No ® No No <br /> OPE Model 71SO 71SO 71SO <br /> What is the OPE response when ® Shut off ® Shut off ® Shut off Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) El Restricts Mestricts © Restricts El Restricts <br /> Flow Flow Flow Flow <br /> El Audible ® Audible Il Audible ® Audible <br /> Alarm Alarm Alarm Alarm <br /> ® Visual © Visual © Visual El Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping I] Yes* 97 Yes* E Yes* r] Yes* <br /> that may interfere with the OPE operation? No F] No I1 No © No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank) 106 1/8 1051/8 1061/2 <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 95 95 s5 <br /> Is the OPE in proper operating condition to ® Yes ® Yes* In Yes* 0 Yes* <br /> respond when the stored substance ® No ® No ® No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results M Pass El Pass M Pass ® Pass <br /> Fail 0 Fail ® Fail Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No" or "Fail'and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />