Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Lodi SP-001 Inspection | 01-31-22 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 02/04/22 <br /> <br />Signature of SP-001 Inspector Date Certified mdahlgren@cgrs.com <br /> <br /> <br />Rudolph Bowman, Jr P.E. , STI Inspector STI AST 40310/ API-653 60073 <br />Printed Name of SP-001/API 653 Quality Review <br /> <br /> 02/04/22 <br /> <br />Signature of API/SP-001 Inspector Date Certified bbowman@cgrs.com <br /> <br /> <br /> <br /> <br />7.Install interstice leak detectors on all outdoor tanks <br />8.Install Grounding <br />4.3 <br /> <br />Fit for Service: <br />Based on the external inspection completed on <br /> <br />January <br /> <br />26, 2021, <br /> <br />all tanks <br /> <br />are considered to be fit for service <br />EXCEPT AST-9, <br /> <br />to contain the intended product currently stored once the above mentioned requirements are <br />addressed. <br />4.4 <br /> <br />Inspection Interval: <br />According to STI SP-001 and AST inspection guidance external inspections may be in <br /> <br />5 years. <br />Printed Name of SP-001Inspector