Laserfiche WebLink
BELOW • PRODUCTS www. • . <br /> OPW 6150 Overfill Materials <br /> Prevention Valves Important <br /> Valve Body : Cast aluminum <br /> The OPW 61 SO Overfill Prevention Valve closed cell foam In order to prevent product spillage <br /> Float : Nitrile rubber, <br /> is designed to prevent the overfill of from the Underground Storage <br /> under round storage tanks b providing Valve : Aluminum Tank (UST), properly maintained <br /> 9 9 Y p 9 delivery equipment and a proper <br /> a positive shut-off of product delivery. Seals : Viton ® connection at the tight-fill adaptor <br /> The shut-off valve is an integral part of Upper & lower Drop Tube : Aluminum are essential . Delivery personnel <br /> pp p should be managed and trained to <br /> the drop tube used for gravity filling . Plastic parts : Acetal inspect delivery elbows and hoses <br /> The OPW 61 SO allows easy installation for damaged and missing parts. <br /> (without breaking concrete) and requires Hardware : Stainless steel They should always make certain <br /> special manholes . there is a positive connection <br /> n0 5 <br /> P between the adaptor and elbow. If <br /> Features delivery equipment is not properly <br /> The OPW 61 SO is a two -stage shut ♦ Simple, Easy and Quick maintained, or the elbow is not <br /> off valve. When the liquid level rises securely coupled to the adaptor, a <br /> o Installation — no excavation or serious spill may result when the <br /> to about 95 % of tank capacity, the P Y <br /> valve mechanism is released, closing special manholes required . DPW 61SO closes,causing a hazard <br /> automatically with the flow. This reduces ♦ Economical — costs a fraction and environmental contamination. <br /> the flow rate to approximately 5 gpm of expensive, complicated and NOTE: The DPW 61 SO is designed <br /> through a bypass valve. The operator difficult-to- install valves . for use on tight-fill gravity drop <br /> may en thstopthe filling process and applications only. Do not use for <br /> g poc ♦ Furnished Complete — supplied pressure fill applications. <br /> disconnect and drain the delivery hose. with new upper and lower drop tubes, <br /> As long as the liquid exceeds the 95 % mounting hardware and thorough <br /> level , the valve will close automatically instructions for quick job site time. <br /> each time delivery is attempted . <br /> ♦ Completely Automatic Operation ♦ Retrofits Directly — for both new <br /> If the delivery is not stopped and the — no prechecks to perform , no resets and existing tanks with 4 " fill risers. <br /> liquid rises to about 98 % of tank capacity, and no overrides to be broken <br /> the bypass valve closes completely. No Quick Drain Feature — <br /> or abused , automatically drains hose when head <br /> additional liquid can flow into the tank <br /> until the level drops below a reset point . ♦ No Pressurization of the Tank — pressure is relieved . <br /> operates directly from liquid level . ♦ Best Flow Rate in The Industry * <br /> The 61 SO Overfill Prevention Valve can be <br /> adjusted to shutoff at any desired tank ♦ Will Accept a Dipstick <br /> capacity. Please contact the Authority for Gauging <br /> Having Jurisdiction (AHJ ) and review * Test-witnessed by Bowser-Morner, Inc ., an independent laboratory. Results available upon request. <br /> local , state, and national codes to <br /> determine the regulatory requirements Advantages of Overfill Prevention <br /> Compared to Overfill Warning Systems: <br /> governing shut- off capacity in your <br /> region , as well as take into account other ♦ Completely Automatic faster fill times and reducing <br /> considerations such as extreme tank tilt . Operation — does not rely on the spill risk . <br /> In all cases, the upper tube must protrude alertness or speed of response of the ♦ Speeds Delivery Operations <br /> into the tank at least 6- 1 /2 " to ensure delivery attendant for certainty of — product flows unimpeded into <br /> that the valve can shut off flow into the overfill prevention . the tank until the hose " kick " that <br /> tank completely before the top of the ♦ Keeps the Top of UST " Dry, " accompanies the valve shut-off <br /> tank is wetted as per EPA requirements . per EPA Requirements — provides a clear signal that the <br /> Models of the 61 SO are available to meet eliminating possible leaks at loose liquid has reached the shut- off level . <br /> virtually any UST application including bung fittings and the need for ♦ Simple and Inexpensive <br /> two - point, coaxial , poppeted coaxial and double containment on vent lines. Installation — in both two-point <br /> remote fill . Methanol approved models ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> are also available. the UST to Stop Flow — allowing additional excavation , manholes or <br /> The OPW 61 SO is approved by the vent piping are required . <br /> New York City Fire Department . <br /> Listings and Look for this Zabel for <br /> (Approval #4902) . <br /> C ® authentic OPW EVR <br /> Certifications <br /> Approved products, <br /> i oPW♦ <br /> DEFINING WHAT ' S NEXT 115 <br />