Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-91-PS 2-87-PS 3-Diesel-PS <br /> Sump Manufacturer CSI CSI CSI <br /> Sump Depth (inches) 55 1/2" 54 1/2" 55" <br /> Sump Bottom to Top of 16" 16 1/2" 16" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:38 *See Note *See Note <br /> Initial Reading .001 NA NA <br /> Test End Time 1:08 NA NA <br /> Final Reading .001 NA NA <br /> Change in Reading 0 NA NA <br /> Pass/Fail Criteria > .002 NA NA <br /> Tightness Test Results M Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 1&3 UDC 2&4 UDC 5&7 UDC 6&8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 8" 8" 8" 8" <br /> Sump Bottom to Top of BP BP BP BP <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:12 1:17 1:22 1:27 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 1:42 1:47 1:52 1:57 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />