My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 10:24:25 AM
Creation date
1/24/2022 11:07:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T3 $� <br /> Measure&record"A"and"Z,"and then peform the following calculation: <br /> "A" 14z-11 Crop tube seal surface to the bottom of the tank <br /> -(subtract) <br /> "Z" ICi 2 3 " Upper d tube flange to We edge of the upper tube adapter <br /> -(subtract) <br /> 4.5" Reference offset <br /> =(equals) <br /> I " F nal shutoff volume height <br /> Locate the final shutoff volume <br /> height on the tank chart <br /> Use the tank chart provided by the tank provided by the tank <br /> manufacturer to record and calculate the following manufacturer,and record the <br /> gal Finalshutoflvolumc <br /> closest corresponding volume <br /> (divide by) <br /> gal Actual tank capaclty <br /> X(muliply by) <br /> 100 <br /> a = (equals) If the final shutoff volume <br /> CL <br /> Percentage is 95%or less,the <br /> AL 'J6 Final shutoff volume percentage d installation conforms.to FFS and <br /> industry recommended practices <br /> 6 gal Actual tank capacity <br /> The final Shutoff Volume Percentage may <br /> - <br /> (subtract) be greater than 95%as long as the ullage <br /> g 'j gal F nal shutoff volume volume remaining Is greater than or <br /> (equals) equal to 2517 gallons,so that" none of <br /> the fittings located on the top of the tank <br /> gal Wage volume remaining are exposed to product due to <br /> overfilling;'according to EPA 40 CFR part <br /> 290 The installation must also meet ail <br /> applicable regulatory requirements and <br /> must be acceptab a to the Authority <br /> Having furisdPet on{AHI). <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.