Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SIECONDARY:`"CONTAINMENT TEST " <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure X Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 Diesel <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> Tank Capacity 11682 11682 11682 <br /> Test Start Time 9:16 9:16 9:32 <br /> Initial Reading 10" hg 10" hg 10" hg <br /> Test End Time 10:16 10:16 10:32 <br /> Final Reading 10" hg 10" hg 10" hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results X Pass ❑ Fail I X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ FaiL11 <br /> 7 PIKE SECONX7ARY CONT.AINMNT TEST <br /> Test Method Developed by ❑ Manufacturer X Industry Standard ❑ Professional Engineer <br /> Test Type X Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 91 Diesel <br /> Pipe Manufacturer <br /> Test Start Time 9:20 9:20 9:20 <br /> Initial Reading 5 psi 5 psi 5 psi <br /> Test End Time 10:20 10:20 10:20 <br /> Final Reading 5 psi 5 psi 5 psi <br /> Change in Reading 0 0 0 <br /> Pass/Fall Criteria 0 0 0 <br /> Tightness Test Results X Pass ❑ Fail I X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pas ail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />