Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 6 of 6) <br /> XXI . UNDER-DISPENSER CONTAINMENT TESTING INFORMATION <br /> Manufacturers IdentifyUDC ID from Section III for each Manufacturer <br /> Bravo/Fiber lass 1 X 2 0 3 4 [:15 El Ll <br /> 9 7 ❑ 8 ❑ 9 ❑ 1 10 ❑ 11 ❑ 1 12 ❑ <br /> 1 ❑ 1 2 ❑ 3 ❑ 1 4 ❑ 1 5 ❑ 1 6 ❑ <br /> 7 ❑ 8 ❑ 9 ❑ 10 ❑ 1 11 ❑ 1 12 ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> p Engineered Method (specify) : Caldwell Systems/Hydrostatic 30 Minutes <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> UDC Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 6/10/2023 <br /> ICC Service Technician #5246802- UT 3/21 /2021 <br /> Underground Storage Tank Tester License #90 - 1120 12/31 /2022 <br /> XXII , COMMENTS <br /> Provide any additional comments here. <br /> If the facility has more components than this form accommodates, additional copies of these pages may be attached. <br /> UDC = Under-0ispenser Containment; ID = Identification <br />