Laserfiche WebLink
Id IN,14A <br /> M� 3 rlQ <br /> 4q, <br /> H 6rw <br /> Undergro'u—ir t -Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCEYes No NA Date last <br /> �I <br /> Has monitoring system certification been completed within the past © Performed <br /> 12 months? 12/16/21 <br /> Has spill container testing been completed within the past © El <br /> 12 months? 12/16/21 <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? © 12/16/21 <br /> Has secondary containment testing been completed within the past X <br /> 36 months? x/04/20 <br /> Has tank tightness testing been completed within required } <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> Other Test / Maintenance; II ' ; <br /> ' <br /> Other Test / Maintenance: <br /> Other Test / Maintenance: <br /> 11 , FACILITY EMPLOYEE TRAINING <br /> Have at, individuals performing facility employee duties received the required facility Yes No <br /> employee training within the past 12 months? <br /> 13 . COMMENTS <br /> This section may be used to recOra comments or observations that are not current compliance <br /> deficiencies. I <br /> Tank and line tightness test is not required for double wall tank and line 1 <br /> AH answers marked "No must be described by the designated UST operator in Section 3, <br /> i <br /> Page 4 of 4 <br /> IMG _0331 <br />