My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:50:23 PM
Creation date
1/24/2022 3:17:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. <br /> Date: <br /> 146Ye 5 1,5-1(�- - �R I',J1,4 <br /> Owner: <br /> Facility: <br /> OPW Overfill Model Number: <br /> Part 1 -Proper Height Setting.Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons A/046/ <br /> Max shut off requirement for flapper is 95% B 95% <br /> Multiply Max tank volume by 95% C Gallons `G,Qc�� <br /> Use tank chart or ATG to determine height of D aches �! <br /> calculated volume <br /> Measure top of fill riser threads,or face seal E Inches <br /> adapter <br /> Tank diameter(From Tank Chart) F Inches <br /> U <br /> Upper Tube in Tank(G)F-D=G G Inches 6 <br /> Subtract 2"from upper tube in tank G-2"=K K Inches <br /> Calculated minimum upper tube length(n <br /> I <br /> K+E=I inches <br /> Actual measured upper tube length(Without J Inches <br /> fill adapter) <br /> Part 2-Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage,contamination,freedom of <br /> movement,weakening due to wear and corrosion) <br /> Device Certification PASS/FAIL <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.