Laserfiche WebLink
the land will be used for car storage. Engineers for ADT have calculated that the facility would .:._. <br /> generate approximately 49,776 gallons of water per day. <br /> The conceptual wastewater delivery system,originally outlined in the Special Purpose Plan,would <br /> be modified to reflect the site plan for the ADT Auto Auction. The auto auction will use private <br /> sanitary sewer lines to serve the entire 204-acre site. Thus, the revised conceptual water system <br /> design would be revised so that the public sewer lines end at:the entrance.to the ADT parcel. The - - <br /> original alignments of the public loop road and public sanitary sewer lines to serve individual <br /> industrial lots would be deleted (Figure 10). <br /> Storm Drainage <br /> The 1994 Special Purpose Plan contains a conceptual storm drainage collection system which sizes <br /> the storm pipes along the loop road in sizes varying from 18 to 48 inches. A temporary detention <br /> basin was originally planned for construction during Phase II of the Plan development, when the <br /> service commercial uses and light industrial activities are completed adj acent to the Mountain House <br /> Parkway/Schulte Road intersection(Figure 11).This temporary detention basin was constructed but <br /> has since been abandoned. <br /> A larger detention basin was originally planned for constniction in the northern portion of the Tri- <br /> State/Cheng parcel near the Patterson Run,to serve later, Phase III development of the site. This <br /> larger detention basin has already been constructed by the business park developer and is functioning <br /> as of 1999. The two detention basins were originally proposed to be linked with an earthen ditch <br /> running parallel to the Delta Mendota Canal. However, an underground permanent storm pipeline <br /> has already been constructed in place of the earthen ditch to drain the developed area around the <br /> United Facilities building to the permanent Phase III detention basin. <br /> The ADT Auto Auction site plan proposes to construct a series of ten-foot vegetative swales that <br /> would drain the project parking areas into the detention basin. The natural swale of Patterson Run- <br /> and Drainage "A"would drain into Area"C,"a wetlands(Figure 11). A third natural drainage in <br /> the northern part of the site(Drainage`V)wouldnotbe modified and would not accommodate any <br /> storm waters from the developed project. . <br /> mpleted by Kier & Wright in May, 2000. In order to <br /> An updated storm drainage study was co <br /> maintain the existing peak flows in the drainage swale after the ADT auto auction project has been <br /> commends that the size of the existing detention basin be increased from 20 <br /> completed, the study re <br /> acre-feet(AF)to 54 AF. <br /> The most recent study found that only a small portion ofthe auto auction project drains directly into <br /> Patterson Run. The project plans show only minor,modifications.to Patterson Run,including <br /> construction oftwoboxculverttypebridges. The studystates that the installation ofthebozculveit -- <br /> bridges would have only minimal effect on storm flows through Patterson Run, because they`are <br /> :.. : =- .designed to not impede fhe 100-year flow. <br /> t _ <br /> v 93231-BoAppOompil-080 <br />