Laserfiche WebLink
REVISED STORM DRAINAGE FACILITIES . Figure 11 <br /> FOR TRI-STATE/CHENG PARCEL <br /> Completed Detention Basin <br /> (Phase my <br /> Discharge from <br /> Area"C„ Detention Basin <br /> Drainage"B" Delete Earthen <br /> Ditch(Pipe has been completed) <br /> r , <br /> ' C <br /> / G O <br /> Draina "A" Delete <br /> . rTemporary Detention Basin <br /> \ (Phase 11) <br /> Public Storm <br /> Drain Lines _ %a <br /> Stub Out Here ' <br /> i <br /> 42 4yo� <br /> a/ I8 ca0a� <br /> o, a <br /> 'a9 IS' 42 Schulte Road <br /> 94cd��� 6 Safeway <br /> Q � Detention <br /> Safeway Basin <br /> (� a+ = <br /> Detention <br /> Basin �•{ O <br /> Midway Road 1 <br /> 4 <br /> Legend _ <br /> 1994 Special Purpose Plan Boundary _ 1 <br /> _- - - -- - - — - - -- -_ <br /> -­.-Amendment Apm <br /> �T Surface Drainages z- --' _ rfi I <br /> t <br /> �� l'--. __ 4-. <br /> a <br /> SEME ­ <br /> 0Fce - <br /> Note:Proposed alignments are in generalized locations. - <br /> D.%9323lao1Graphics\9323110(Visual Cadd) 1025/99.' <br />