Laserfiche WebLink
REVISED STORM DRAINAGE FACILITIES Figure 11 <br /> FOR TRI-STATE/CHENG PARCEL <br /> Completed Detention Basin <br /> (Phase 111) <br /> T ' <br /> 3 Discharge from <br /> Area"C" `o . Detention Basin <br /> Drainage "B" <br /> H Delete Earthen <br /> Ditch(Pipe has been completed) <br /> Drain "A" j Delete <br /> Temporary Detention Basin <br /> (Phase 11) <br /> Public Storm <br /> Drain Lines <br /> Stub Out Here <br /> ? 36" <br /> 1 <br /> 42 <br /> 8 Me°00112 <br /> cd�0 <br /> 142" Schulte Road <br /> Safeway <br /> � Detention <br /> Safeway Basin <br /> Detention ❑ <br /> Basin <br /> MidwayT — <br /> Road — <br /> �s <br /> Legend <br /> ........... <br /> ............ 1994 Special Purpose Plan Boundary <br /> ���11ULLGd Amendment Area <br /> —� Surface Drainages <br /> 0 D 2000 Feet <br /> BNote:Proposed alignments are in generalized locations. A5LMEt <br /> D:\9323lao\Graphics\93231 10(Visual Cadd) 10/25/99 <br /> -20- <br />