Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 9&10 UDC 11&12 <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 28" 28" <br /> Sump Bottom to Top of 8" 8" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:45 10:50 <br /> Initial Reading .001 .001 <br /> Test End Time 11:15 11:20 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria > .002 > .002 <br /> Tightness Test Results M Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 1-Dsl-FS 2-91-FS 3-87-FS <br /> Sump Manufacturer XERXES XERXES XERXES <br /> Sump Depth (inches) 65" 65" 65" <br /> Sump Bottom to Top of 26" 26" 26" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:47 9:27 10:07 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 9:17 9:57 10:37 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />