Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 SOIL SUITABILITY STUDY.............................................................................................3 <br />1.1 <br />Introduction and Development.............................................................................3 <br />1.1.1 Site Description........................................................................................3 <br />1.1.2 Proposed Development............................................................................4 <br />1.1.3 Site Vicinity...............................................................................................4 <br />1.1.4 Site Map...................................................................................................4 <br />1.2 <br />Present and Past Uses of the Site.......................................................................4 <br />1.2.1 Past and Present Site Use........................................................................4 <br />1.3 <br />Existing and Proposed Septic Tank Usage..........................................................5 <br />1.3.1 Existing On -Site Septic Tank Usage.........................................................5 <br />1.3.2 Site Specific Permit History......................................................................5 <br />1.3.3 Discussion of On -Site Septic Tank Installation and Repair .......................5 <br />1.3.4 Existing Septic Tank Usage in the Vicinity................................................5 <br />1.3.5 Septic Permit History in the Vicinity..........................................................6 <br />1.3.6 Septic Repair Permit History in the Vicinity...............................................6 <br />1.3.7 Expected On -Site Maximum Septic Tank Usage......................................6 <br />1.4 <br />Groundwater Information.....................................................................................7 <br />1.4.1 Groundwater Depth and Gradient.............................................................7 <br />1.4.2 Potential Groundwater Contamination Issues...........................................7 <br />1.5 <br />Soil Profile and Geologic Information...................................................................8 <br />1.5.1 Soil Boring Locations................................................................................8 <br />1.5.2 Soil Boring Dimensions............................................................................8 <br />1.5.3 Soil Lithology Observed............................................................................9 <br />1.5.4 Discussion of Soil Lithology......................................................................9 <br />1.6 <br />Percolation Test Information................................................................................9 <br />1.6.1 Percolation Test Locations.......................................................................9 <br />1.6.2 Number of Percolation Tests....................................................................9 <br />1.6.3 Boring Preparation and Presaturation.....................................................10 <br />1.6.4 Condition of Borings after Presaturation.................................................10 <br />1.6.5 Percolation Test Procedure....................................................................10 <br />1.6.6 Percolation Test Forms and Results.......................................................10 <br />1.6.7 Discussion of Percolation Test Results...................................................11 <br />1.6.8 Discussion of Septic System Sizing........................................................11 <br />2.0 NITRATE LOADING STUDY.........................................................................................11 <br />2.1 <br />Chemical and Physical Properties of Soil...........................................................12 <br />2.1.1 Chemical and Physical Soil Properties...................................................12 <br />2.1.2 Mass Transport Soil Properties..............................................................12 <br />2.2 <br />Groundwater Analysis........................................................................................12 <br />2.2.1 Regional Groundwater............................................................................12 <br />2.2.2 Potential Ground Water Contamination Issues.......................................13 <br />2.2.3 Current and Future On -Site Ground Water Uses....................................13 <br />2.3 <br />Sources and Impact of Nitrate to Groundwater..................................................13 <br />2.3.1 Current Off -Site Sources of Nitrate.........................................................13 <br />2.3.2 Contribution of Rainfall...........................................................................13 <br />2.3.3 Current On -Site Sources of Nitrate.........................................................14 <br />2.3.4 Future On -Site Sources of Nitrate...........................................................14 <br />2.3.4.1 <br />Quantity and Quality of Wastewater from Project..........................................14 <br />2.3.4.2 <br />Denitrification Estimate.................................................................................14 <br />Responsive ■ Resourceful ■ Reliable <br />