Laserfiche WebLink
Soil Suitability /Nitrate Loading Study Irerracon <br />Thornton Road Trailer Parking Facility ■ Lodi, California <br />December 15, 2021 ■ Terracon Project No. NA217079 <br />In an attempt to determine the septic system density for the vicinity of the site, our office reviewed <br />a recent aerial photograph of the property available from GoogleEarthTM. There are no septic <br />systems in the vicinity. <br />1.3.5 Septic Permit History in the Vicinity <br />Terracon searched the EHD Public Records website for the adjoining property septic permits. <br />There are no permits available for the adjoining properties: <br />1.3.6 Septic Repair Permit History in the Vicinity <br />No repair to any septic systems because there are no septic systems in the vicinity. <br />1.3.7 Expected On -Site Maximum Septic Tank Usage <br />According to information provided by the client, the site will be occupied seven days per week, 10 <br />hours per day, year round. <br />Table 3. <br />Expected Hours, Shifts, Employees and Customers <br />Building ID <br />Shift <br />Shift Times <br />Average Number of <br />Average Number Customers <br />(Size) <br />Hours <br />Employees per shift <br />per Shift <br />Trailer Parking Facility <br />10 <br />7am-5pm <br />3 <br />10 <br />(4,900 SF) <br />Based on the review of the OWTS Manual, the flowrate for the proposed Trailer Parking Facility <br />is 15 -gallons per 8 hour day (gpd), similar to an industrial building with no food cafeteria. The <br />flowrate for a customer is 5 -gallons per day, similar to an airport passenger (2017 OWTS Manual <br />page 21). It should be noted the employee effluent was calculated as follows for a 10 hour day: <br />15 gpd / 8 hour day = 1.875 gallons per hour x 10 hours = 18.75 gpd. Customers are assumed to <br />be onsite less than 8 hours per day. <br />Expected On -Site Maximum Septic Tank Usage <br />3 Employees x 18.75 -gallons per day (10 hour shift) = 56.25 GPD <br />10 Customers x 5 -gallons per day = 50 GPD <br />Maximum Total GPD = 106.25 GPD <br />The maximum daily flow rate for the proposed Trailer Parking Facility operations is approximately <br />106.25 gallons of effluent per day. <br />Responsive ■ Resourceful ■ Reliable 6 <br />