My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:51:32 PM
Creation date
1/27/2022 9:02:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A NJ O A Q U l N Environmental Health Department <br /> COUNTY— <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ARCO STATION#826951 130 S WILSON WAY, STOCKTON January 25, 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the secondary <br /> containment testing on the designated operator inspection reports.The secondary containment test date was <br /> incorrectly noted as 5/14/21.The correct date for the secondary containment testing is 5/14/2020. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> -------------------------------------------------------------------- <br /> -------------------------------------------------------------------- <br /> OBSERVATION: The owner or operator did not provide a description of each corrective action taken or to be taken, <br /> acknowledging the identified compliance issues, on the designated operator reports from the following dates: <br /> 6/3/2021, 7/1/2021, 7/30/2021, 8/27/2021, 9/23/2021, 11/19/2021, and 12/17/2021. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> -------------------------------------------------------------- <br /> -------------------------------------------------------------- <br /> OBSERVATION: The designated operator failed to document all the alarms from the attached alarm history on the <br /> 12/17/2021 designated operator inspection report and failed to check that they were responded to appropriately. <br /> The missing alarms include: <br /> - 12/12/2021 and 12/13/2021 Q1 91 PLLD Shutdown <br /> - 12/12/2021 and 12/13/2021 Q2 87 PLLD Shutdown <br /> REGULATION GUIDANCE: During the inspection,the designated operator shall review the alarm history since the <br /> previous inspection, check that each alarm was documented and responded to appropriately, and attach a copy of <br /> the alarm history with documentation taken in response to any alarms to the inspection report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> This is a repeat violation, Class II. <br /> FA0003601 PR0231861 SCO01 01/25/2022 <br /> EHD 23-01 Rev.12/06/2021 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.