My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 10:37:24 AM
Creation date
1/27/2022 9:41:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 24, 2021 Lab ID : STK2152815 <br /> Metal Finishing Solutions, Inc. Customer : 3-18181 <br /> Quality Control-Inorganic <br /> Constituent Method Date/ID Type Units Cone. QC Data DQO Note <br /> Metals <br /> Cobalt 200.8 09/22/21:214828AC ICB ppb 0.057 0.2 <br /> CCV ppb 120.0 101% 90-110 <br /> CCB ppb -0.003 0.2 <br /> Copper 200.8 09/16/21:210733CTC Blank ug/L ND <1 <br /> LCS ug/L 50.00 105% 85-115 <br /> MS ug/L 50.00 54.7% 75-125 435 <br /> MS ug/L 50.00 121% 75-125 <br /> (CC 2183269-001) MSD ug/L 50.00 71.1% 75-125 435 <br /> MSRPD ug/L 50.00 6.4% 7_20.0 <br /> (CC 2183269-002) MSD ug/L 50.00 119% 75-125 <br /> MSRPD u 50.00 1.6% <20.0 <br /> 200.8 09/22/21:214779AC CCV ppb 120.0 105% 90-110 <br /> CCB ppb -0.592 0.5 220 <br /> CCV ppb 120.0 98.9% 90-110 <br /> CCB ppb -0.892 0.5 220 <br /> 200.8 09/22/21:214828AC ICV ppb 120.0 102% 90-110 <br /> ICB ppb 0.065 0.5 <br /> CCV ppb 120.0 103% 90-110 <br /> CCB ppb 0.163 0.5 <br /> Lead 200.8 09/16/21:210733CTC Blank ug/L ND <0.5 <br /> LCS ug/L 50.00 94.9% 85-115 <br /> MS ug/L 50.00 107% 75-125 <br /> MS ug/L 50.00 114% 75-125 <br /> (CC 2183269-001) MSD ug/L 50.00 113% 75-125 <br /> MSRPD ug/L 50.00 5.3% <20.0 <br /> (CC 2183269-002) MSD ug/L 50.00 116% 75-125 <br /> MSRPD ug/L 50.00 1.7% <20.0 <br /> 200.8 09/22/21:214779AC CCV ppb 120.0 101% 90-110 <br /> CCB ppb 0.004 0.5 <br /> CCV ppb 120.0 98.2% 90-110 <br /> CCB ppb -0.003 0.5 <br /> 200.8 09/22/21:214828AC ICV ppb 120.0 101% 90-110 <br /> ICB ppb 0.017 0.5 <br /> CCV ppb 120.0 102% 90-110 <br /> CCB ppb 0.001 0.5 <br /> Molybdenum 200.8 09/16/21:210733CTC Blank ug/L ND <1 <br /> LCS ug/L 50.00 92.0% 85-115 <br /> MS ug/L 50.00 113% 75-125 <br /> MS ug/L 50.00 115% 75-125 <br /> (CC 2183269-001) MSD ug/L 50.00 116% 75-125 <br /> MSRPD ug/L 50.00 2.5% <20 <br /> (CC 2183269-002) MSD ug/L 50.00 114% 75-125 <br /> MSRPD ug/L 50.00 0.2% :520 <br /> 200.8 09/22/21:214779AC CCV ppb 120.0 98.1% 90-110 <br /> CCB ppb 0.55 1 <br /> CCV ppb 120.0 96.3% 90-110 <br /> CCB ppb 0.28 1 <br /> 200.8 09/22/21:214828AC ICV ppb 120.0 102% 90-110 <br /> ICB ppb 0.83 1 <br /> CCV ppb 120.0 102% 90-110 <br /> CCB ppb 0.12 1 <br /> Nickel 200.8 09/16/21:210733CTC Blank ug/L ND <1 <br /> LCS ug/L 50.00 103% 85-115 <br /> �Ms ug/L 50.00 111% 75-125 <br /> Page 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.