My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 10:37:24 AM
Creation date
1/27/2022 9:41:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pretreatment Industrial Users <br /> General Permit Conditions Page <br /> 6 of 14 <br /> discharged and daily wastewater activities, including maintenance activities. These 1 <br /> characteristics shall include, but not limited to, flow volume, flow rate, and pH values. In <br /> addition, the log book shall list the date, time, and volume of any effluent which is found <br /> to contain wastewater which is determined to be unacceptable for discharge to the sewer. <br /> The final disposition or disposal of all wastewater found to be unacceptable for discharge <br /> to the sewer shall also be included in the log book. <br /> 16. Permittee shall perform all required quality assurance and control procedures as <br /> contained within the City of Stockton, Department of Municipal Utilities, Quality Assurance <br /> Manual for Self-Monitored Industries in conjunction with the permittee's Self-Monitoring <br /> Sample Program. <br /> 17. The City may use either grab samples or composite samples for the determination of <br /> compliance with local limitations and other applicable limits. <br /> 18. Permittee shall notify the City of Stockton, Environmental Control Office, within 24 hours <br /> of discovery of any violation of Federal Categorical Pretreatment Standards, State, local <br /> limitations or any other condition contained in this permit. Notifications can be made either <br /> in person, by telephone or email.Text messaging is not acceptable. Permittee shall repeat <br /> sampling and pollutant analysis for those parameters which exceeded limitation <br /> requirements within 30 calendar days after becoming aware of the initial violation and any <br /> repeat violations. Permittee shall submit, in writing, the results of all repeat sampling. <br /> Permittee shall also report all steps taken or to be taken to reduce, eliminate, and prevent -, <br /> recurrence of such violations. Any instances of failure to report violations by the permittee <br /> may result in the issuance of maximum enforcement actions allowed by the Stockton <br /> Municipal Code. <br /> 19. Permittee shall comply with all reporting requirements contained within the Federal <br /> Pretreatment Regulations(40 CFR 403)and within the specific requirements of this permit. <br /> At a minimum, unless otherwise specified in this wastewater discharge permit, the <br /> following reporting requirements shall apply: <br /> a. Monthly Reporting: Reports shall be submitted to the City of Stockton <br /> Environmental Control section no later than the 10th day of the following month for <br /> which monitoring was conducted. If the 10th day of the month falls on a weekend <br /> or federal holiday, the report is due on the next regular business day.Reports shall <br /> include data specific to the calendar month and shall include data for the entire <br /> calendar month. Complete laboratory documentation, including quality control <br /> data, for all sampling performed during the reporting period is required to be <br /> submitted. <br /> b. Semi-annual Reporting: Reports shall be submitted to the City of Stockton <br /> Environmental Control section no later than the 10th day of January and July of <br /> each year (for the previous six-month period). If the 10th day of January or July <br /> falls on a weekend or federal holiday, the report is due on the next regular business <br /> day. Reports shall include data specific to the six-month period and shall include <br /> data for the entire six-month period. Complete laboratory documentation, including <br />
The URL can be used to link to this page
Your browser does not support the video tag.