Laserfiche WebLink
Pretreatment Industrial Users <br /> General Permit Conditions Page <br /> 12 of 14 <br /> a letter sent certified mail of the requirementto obtain a new Wastewater Discharge <br /> Permit. A copy of the letter must also be immediately forwarded to the City. <br /> C. Any new or succeeding owner shall also comply with the terms and conditions of <br /> the existing permit until a new permit can be issued, not to exceed a total permit <br /> duration of 5 years. <br /> 38. Duration: <br /> a. Permits shall be issued for a specified time period, not to exceed 5 years.A permit <br /> may be issued for a period less than 5 years and may be specified to expire on a <br /> specific date. <br /> b. If the permittee wishes to continue an activity regulated by this permit,the permittee <br /> must submit an application for a new permit at least 90 calendar days prior to the <br /> expiration date of this permit. If a 5-year permit is not renewed prior to expiration, <br /> that permit shall no longer be valid and shall be automatically terminated. <br /> C. An expired permit of less than 5 years in duration will continue to be effective and <br /> enforceable as long as the following conditions apply: <br /> 1. The permittee has submitted a completed permit application at least 90 <br /> calendar days prior to the expiration date of the existing permit. -1 <br /> 2. The failure to reissue the permit, prior to the expiration of the previous <br /> permit, is not due to any act on the part of the permittee. <br /> 3. The total permit duration does not exceed 5 years. <br /> d. An expired permit cannot be extended past the 5-year expiration date under any <br /> circumstances and if not renewed prior to the 5-year expiration, will automatically <br /> terminate. <br /> 39. Permittee shall, if necessary, provide, maintain, and operate a pretreatment system <br /> capable of meeting all applicable limitations and permit requirements. Permittee shall <br /> insure that all pretreatment equipment is in proper working condition at all times. A <br /> pretreatment system maintenance schedule and all maintenance records for pretreatment <br /> equipment shall be kept and be made available to the City upon request. The City may <br /> require that when necessary for the safe and proper operation of pretreatment equipment <br /> that the permittee shall provide all necessary training and education to permittee's <br /> pretreatment plant operators. At a minimum, educational training shall include: <br /> a. General principles of pretreatment equipment operation. <br /> b. Basic understanding of the mathematics relating to pretreatment equipment. <br /> C. Understanding of basic sampling on monitoring techniques. <br /> d. Basic knowledge of the regulations and limits governing the regulations for 1 <br /> wastestream type being discharged. <br />