My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:07:44 PM
Creation date
1/31/2022 8:25:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br /> 97 <br /> Measure&record"A"and'%"and then peform the following calculation: <br /> "A" S " Drop tube seal surface to the bottom of the tank <br /> -(subtract) <br /> JQj " Upper drop tube flange to the edge of the upper tube adapter <br /> -(Subtrac <br /> 4.5" Reference offset <br /> _(equals) <br /> " Final shutoff volume height <br /> Locate the final shutoff volume <br /> height on the tank chart <br /> Use the tank chart provided by the tank provided by the tank <br /> manufacturer to record and calculate the following: manufacturer,and record the <br /> closest corresponding volume. <br /> gal Final shutoff volume <br /> (divide by) <br /> /101 ga I Actual tank capacity <br /> X(muliply by) <br /> 100 <br /> > _(equals) If the final shutoff volume <br /> 0 0 } percentage is 95%or less,the <br /> F Final shutoff volume percentage installation conforms to FFS and <br /> Lindustry recommended practices. <br /> a j 0/y ga I Actual tank capacity <br /> (subtract) The final Shutoff Volume Percentage may <br /> be greater than 95%as long as the ullage <br /> LIZgal Final shutoff volume volume remaining is greater than or <br /> _(equals) equal to 250 gallons,so that"...none of <br /> � the fittings located the top of the tank <br /> Cf a� Ullage volume remaining are exposed to product due to <br /> overfilling,"according to EPA 40 CFR Part <br /> 280. The installation must also meet all <br /> applicable regulatory requirements,and <br /> must be acceptable to the Authority <br /> Having Jurisdiction(AH1). <br />
The URL can be used to link to this page
Your browser does not support the video tag.